Dharmawan Setiyoko, 1325011006 (2015) OPTIMASI WADUK REGULATING DAM DI KABUPATEN PRINGSEWU, PROVINSI LAMPUNG. Masters thesis, Universitas Lampung.
|
Text
Abstract.pdf Download (12Kb) | Preview |
|
|
Text
Cover Dalam.pdf Download (10Kb) | Preview |
|
|
Text
Cover Depan.pdf Download (10Kb) | Preview |
|
|
Text
Daftar Gambar.pdf Download (6Kb) | Preview |
|
|
Text
Daftar Isi.pdf Download (85Kb) | Preview |
|
|
Text
Daftar Tabel.pdf Download (9Kb) | Preview |
|
|
Text
Lembar Persetujuan.pdf Download (752Kb) | Preview |
|
|
Text
Lembar Pengesahan.pdf Download (811Kb) | Preview |
|
|
Text
Lembar Pernyataan.pdf Download (753Kb) | Preview |
|
|
Text
Motto.pdf Download (11Kb) | Preview |
|
|
Text
Persembahan.pdf Download (20Kb) | Preview |
|
|
Text
Riwayat Hidup.pdf Download (11Kb) | Preview |
|
|
Text
Sanwacana.pdf Download (60Kb) | Preview |
|
|
Text
BAB I.pdf Download (59Kb) | Preview |
|
|
Text
BAB II.pdf Download (245Kb) | Preview |
|
|
Text
BAB III.pdf Download (394Kb) | Preview |
|
![]() |
Text
BAB IV.pdf Restricted to Registered users only Download (555Kb) |
|
|
Text
BAB V.pdf Download (9Kb) | Preview |
|
|
Text
Daftar Pustaka.pdf Download (49Kb) | Preview |
Abstrak
Abstrak Bendung Argoguruh adalah bendung irigasi yang terbesar di Provinsi Lampung. Bendung ini dibangun tahun 1935 di Sungai Way Sekampung dan melayani Daerah Irigasi Sekampung seluas 67.000 ha. Bendung ini mendapat suplai air dari Bendungan Batutegi dan baseflow dari DAS Way Sekampung bagian hulu. Kelebihan air yang melewati Bendung Argoguruh selama ini hanya melimpas dan terbuang percuma ke laut. Oleh karena itu, direncanakanlah pembangunan sebuah bendungan di antara Bendungan Batutegi dan Waduk Argoguruh untuk menampung dan memanfaatkan limpasan debit yang melewati Bendung Argoguruh. Bendungan tersebut adalah sebuah Regulating Dam yang dibangun di Kabupaten Pringsewu. Penelitian ini bertujuan untuk melakukan simulasi neraca air di Regulating Dam sehingga diperoleh suatu pola operasi yang paling optimal dalam pengoperasian Regulating Dam. Objective function dari simulasi adalah elevasi muka air waduk dengan keandalan 80%. Adapun constrain dari simulasi adalah elevasi muka air waduk tidak boleh kurang dari elevasi muka air untuk tampungan mati yaitu +102,30 m. Data debit yang digunakan dalam simulasi adalah data debit limpasan Bendung Argoguruh dari tahun 2005 sampai dengan tahun 2013. Simulasi dilakukan untuk periode waktu 15 harian. Hasil simulasi menunjukkan bahwa objective function dari simulasi adalah elevasi +116,07 m dengan keandalan 80,09%. Pada saat tersebut air dari Regulating Dam digunakan untuk suplai PDAM Pringsewu sebesar 0.45 m3/dt dan pengairan sawah baru seluas 242,90 ha. Adapun elevasi terendah pada simulasi ini adalah +111,86 m yang berarti masih jauh di atas elevasi muka air waduk pada tampungan mati. Kata kunci : Regulating Dam, Simulasi, Constrain, dan Objective function Abstract Argoguruh Weir is the biggest irrigation weir in Lampung Province. This hydraulic structure was developed in 1935, crossing Way Sekampung River and serving Sekampung Irrigation Area which is about 67,000 ha. This weir is supplied by water from Batutegi Dam and baseflow of the upper Way Sekampung basin. Excessive water in Argoguruh Weir is passing by and flowing to the sea. Due to this condition, the government plan to build a dam between Batutegi Dam and Argoguruh Weir in order to store and utilise the excessive water. The dam is called Regulating Dam and will be built in Pringsewu Regency. This research aims to carry out a simulation of water balance in the Regulating Dam in order to find the best operational pattern for the dam. The Objective function of the simulation is water elevation of reservoir with probability more than 80%. The constrain of the simulation is that water elevation of the reservoir has to be higher than the water elevation of reservoir dead storage that is +102.30 m. Discharge data used in the simulation is daily discharge data of Argoguruh Weir from the year 2005 to the year 2013. The simulation is operated in 15-days time basis. Results of the simulation indicate that the objective function of the simulation is found in elevation +116.07 m with probability of 80.09%. On that condition, water from the reservoir is utilised for PDAM Pringsewu water supply and for the water supply for 242.90 ha new irrigation area. The lowest water elevation in this condition is +111.86 m. This water elevation is much more higher than the one of reservoir dead storage. Key Words: Regulating Dam, Simulation, Constrain, and Objective function
Tipe Karya Ilmiah: | Tesis (Masters) |
---|---|
Subyek: | > Mesin (General). Mesin Sipil (General) > Mesin (General). Mesin Sipil (General) Mesin (General). Mesin Sipil (General) > Konstruksi bangunan > Konstruksi bangunan |
Program Studi: | Fakultas Teknik > Prodi Magister Teknik Sipil |
Depositing User: | 5841903 . Digilib |
Date Deposited: | 02 Jul 2015 04:17 |
Last Modified: | 02 Jul 2015 04:17 |
URI: | http://digilib.unila.ac.id/id/eprint/10710 |
Actions (login required)
![]() |
View Item |