Adek Aysah Ramadhani, 0915041001 (2015) PRARANCANGAN PABRIK EPICHLOROHYDRIN DARI DICHLOROHYDRIN DAN SODIUM HIDROKSIDA KAPASITAS 50.000 TON/TAHUN (Perancangan Menara Distilasi (DC-301)). FAKULTAS TEKNIK, UNIVERSITAS LAMPUNG.
|
File PDF
COVER LUAR.pdf Download (20Kb) | Preview |
|
|
File PDF
ABSTRAK.pdf Download (7Kb) | Preview |
|
|
File PDF
ABSTRACT.pdf Download (7Kb) | Preview |
|
|
File PDF
COVER DALAM.pdf Download (12Kb) | Preview |
|
|
File PDF
LEMBAR PERSETUJUAN.pdf Download (217Kb) | Preview |
|
|
File PDF
LEMBAR PENGESAHAN.pdf Download (201Kb) | Preview |
|
|
File PDF
LEMBAR PERNYATAAN.pdf Download (210Kb) | Preview |
|
|
File PDF
RIWAYAT HIDUP.pdf Download (13Kb) | Preview |
|
|
File PDF
MOTO.pdf Download (23Kb) | Preview |
|
|
File PDF
SANWACANA.pdf Download (11Kb) | Preview |
|
|
File PDF
DAFTAR ISI.pdf Download (10Kb) | Preview |
|
|
File PDF
DAFTAR TABEL.pdf Download (21Kb) | Preview |
|
|
File PDF
SURAT PERNYATAAN BERJILBAB.pdf Download (110Kb) | Preview |
|
|
File PDF
DAFTAR GAMBAR.pdf Download (7Kb) | Preview |
|
|
File PDF
BAB I.pdf Download (169Kb) | Preview |
|
File PDF
BAB II.pdf Restricted to Hanya pengguna terdaftar Download (51Kb) |
||
File PDF
BAB III.pdf Restricted to Hanya pengguna terdaftar Download (10Kb) |
||
File PDF
BAB IV.pdf Restricted to Hanya pengguna terdaftar Download (224Kb) |
||
File PDF
BAB V.pdf Restricted to Hanya pengguna terdaftar Download (182Kb) |
||
File PDF
BAB VI.pdf Restricted to Hanya pengguna terdaftar Download (82Kb) |
||
File PDF
BAB VII.pdf Restricted to Hanya pengguna terdaftar Download (302Kb) |
||
File PDF
BAB VIII.pdf Restricted to Hanya pengguna terdaftar Download (94Kb) |
||
File PDF
BAB IX.pdf Restricted to Hanya pengguna terdaftar Download (66Kb) |
||
File PDF
BAB X.pdf Restricted to Hanya pengguna terdaftar Download (7Kb) |
||
|
File PDF
DAFTAR PUSTAKA.pdf Download (13Kb) | Preview |
Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)
Pabrik epichlorohydrin berbahan baku dichlorohydrin dan sodium hidroksida, akan didirikan di Purwakarta, Jawa Barat. Pabrik ini berdiri dengan mempertimbangkan ketersediaan bahan baku, sarana transportasi yang memadai, tenaga kerja yang mudah didapatkan dan kondisi lingkungan. Pabrik direncanakan memproduksi epichlorohydrin sebanyak 50.000 ton/tahun, dengan waktu operasi 24 jam/hari, 330 hari/tahun. Bahan baku yang digunakan adalah dichlorohydrin sebanyak 862,78 kg/jam dan sodium hidroksida sebanyak 795,29 kg/jam. Jumlah karyawan sebanyak 175 orang dengan bentuk perusahaan adalah Perseroan Terbatas (PT) menggunakan struktur organisasi line dan staff. Dari analisis ekonomi diperoleh: Fixed Capital Investment (FCI) = Rp 451.126.572.835,51,- Working Capital Investment (WCI) = Rp 78.049.580.075,35,- Total Capital Investment (TCI) = Rp 529.176.152.910,86,- Break Even Point (BEP) = 52% Shut Down Point (SDP) = 30% Pay Out Time after Taxes (POT)a = 3 tahun Return on Investment after Taxes (ROI)a = 20 % Annual Net Profit (Pa) = Rp 99.679.724.646,25/tahun Mempertimbangkan paparan di atas, sudah selayaknya pendirian pabrik epichlorohydrin ini dikaji lebih lanjut, karena merupakan pabrik yang menguntungkan dan mempunyai masa depan yang baik. A plant to produce epichlorohydrin from dichlorohydrin and sodium hydroxide is planned to be located at Purwakarta, West Java. The plant is established by considering availability of raw materials, transportation facilities, readily available labor and environmental conditions. Capacity of the plant is 50.000 tons/year operating 24 hour/day and 330 working days/year. The plant required 862,78 kg/hr dichlorohydrin and 795,29 kg/hr sodium hydroxide. Quantity of labor is around 175 people. The plant is managed as a Limited Liability Company (PT), which is headed by a Director who is assisted by a Director of Production and Director of Finance. The company is organized in the form of line and staff structure. From analysis of the plant economy is obtained: Fixed Capital Investment (FCI) = Rp 451.126.572.835,51,- Working Capital Investment (WCI) = Rp 78.049.580.075,35,- Total Capital Investment (TCI) = Rp 529.176.152.910,86,- Break Even Point (BEP) = 52% Shut Down Point (SDP) = 30% Pay Out Time after Taxes (POT)a = 3 year Return on Investment after Taxes (ROI)a = 20 % Annual Net Profit (Pa) = Rp 99.679.724.646,25/year By considering above the summary, it is suitable study further the epichlorohydrin plant since plant is profitable and has good prospects.
Jenis Karya Akhir: | Skripsi |
---|---|
Subyek: | > QD Chemistry |
Program Studi: | Fakultas Teknik > Prodi S1-Teknik Kimia |
Pengguna Deposit: | 2178231 . Digilib |
Date Deposited: | 24 Jul 2015 03:42 |
Terakhir diubah: | 24 Jul 2015 03:42 |
URI: | http://digilib.unila.ac.id/id/eprint/11276 |
Actions (login required)
Lihat Karya Akhir |