JOKO PRANSYTIO, 1115021044 (2015) PERANCANGAN BALOK BETON PROFIL RINGAN UNTUK PEMASANGAN LANTAI BANGUNAN BERTINGKAT YANG EFEKTIF. FAKULTAS TEKNIK, UNIVERSITAS LAMPUNG.
|
Text
(1) COVER LUAR.pdf Download (37kB) | Preview |
|
|
Text
(2) ABSTRAK.pdf Download (8kB) | Preview |
|
|
Text
(3) ABSTRACT.pdf Download (7kB) | Preview |
|
|
Text
(4) COVER DALAM.pdf Download (38kB) | Preview |
|
|
Text
(5) PERSETUJUAN.pdf Download (151kB) | Preview |
|
|
Text
(6) PENGESAHAN.pdf Download (143kB) | Preview |
|
|
Text
(7) PERNYATAAN.pdf Download (134kB) | Preview |
|
|
Text
(8) RIWAYAT HIDUP.pdf Download (15kB) | Preview |
|
|
Text
(9) MOTO.pdf Download (29kB) | Preview |
|
|
Text
(10) PERSEMBAHAN.pdf Download (7kB) | Preview |
|
|
Text
(11) SANWACANA.pdf Download (119kB) | Preview |
|
|
Text
(12) DAFTAR ISI.pdf Download (192kB) | Preview |
|
|
Text
(13) DAFTAR GAMBAR.pdf Download (12kB) | Preview |
|
|
Text
(14) DAFTAR TABEL.pdf Download (5kB) | Preview |
|
|
Text
BAB I.pdf Download (154kB) | Preview |
|
|
Text
BAB II.pdf Download (644kB) | Preview |
|
|
Text
BAB III.pdf Download (1MB) | Preview |
|
|
Text
BAB IV.pdf Restricted to Registered users only Download (813kB) |
||
|
Text
BAB V.pdf Download (90kB) | Preview |
|
|
Text
DAFTAR PUSTAKA.pdf Download (112kB) | Preview |
Abstract
Penelitian ini dilatarbelakangi oleh keprihatinan terhadap laju kehilangan hutan (deforestasi), yang salah satu penyebabnya adalah penggunaan kayu untuk bekisting pengecoran beton pada lantai bangunan bertingkat. Berbagai upaya pun telah dilakukan peneliti sebelumnya dan menawarkan berbagai produk, misalnya keramik komposit beton (ceiling brick) dan balok dari beton berpori. Produk-produk yang telah ada masih saja menyisakan beberapa kekurangan, diantaranya teknologi dan harga yang relatif tinggi. Penelitian ini akan mengupayakan metode baru untuk pengecoran dak beton yang efektif. Metode ini menawarkan balok-balok profil ringan yang dirancang sedemikian rupa supaya susunan balok-balok terpasang saling mengunci. Analisis kekuatan dilakukan dengan metode numerik. Material model dan beban yang diberikan mengacu kepada peraturan pembebanan Indonesia untuk gedung (SNI 03-2847-2002). Di ujung balok, faktor keamanan untuk besi tulangan sebesar 31,616 dan untuk beton sebesar 5,874. Di tengah balok, faktor keamanan untuk besi tulangan sebesar 39,702 dan untuk beton sebesar 1,547. Jika analisis dilakukan terhadap balok yang sudah dirakit maka faktor keamanan akan meningkat. Sebagai contoh, di bagian tengah balok faktor keamanan untuk beton bertambah menjadi 2,126 untuk 7 balok. Balok profil ini relatif ringan (kurang lebih 25 kg/m) sehingga efektif dalam pemasangan dan minimal dalam penggunaan kayu bekisting. Kata kunci: laju kehilangan hutan, balok beton, lantai bangunan bertingkat, metode numerik Abstrak Bahasa Inggris This research was based on the concern on rapid deforestation or forest loss that is caused by the use of wood for concrete casting formwork in multi-stages building floor. Researchers have done various attempts by offering a range of alternative products such as ceiling brick and porous concrete block. However, those existing products come with high price. This research aims to pursue more effective new method in concrete casting. It offered lightweight concrete beam that has specifically been designed and arranged to lock each other when installed. Strength analysis has been done by numerical method. The model and loading material was referred to the Indonesian load code for building (SNI 03-2847-2002). On the tip of the beam, safety factor for the steel reinforcement was 31,616 and for concrete was 5,874. In the middle of the beam, safety factor for the steel reinforcement was 39,702 and concrete was 1.547. If the analysis is done to the assembled concrete, the factor will raise. For instance, in the middle of the beam, safety factor for concrete increase to 2.126 for seven beams. This beam profile is categorized as lightweight (less than 25kg/m). Therefore, it is effective for floor installation and can minimize the use of wood. Keywords: deforestation, concrete beam, multi-stages building floor, numerical method.
| Item Type: | Other |
|---|---|
| Subjects: | Mesin (General). Mesin Sipil (General) Teknologi > Mesin (General). Mesin Sipil (General) Teknologi > Mesin (General). Mesin Sipil (General) |
| Divisions: | Fakultas Teknik > Prodi Teknik Mesin |
| Depositing User: | 1584064 . Digilib |
| Date Deposited: | 28 Oct 2015 04:58 |
| Last Modified: | 28 Oct 2015 04:58 |
| URI: | http://digilib.unila.ac.id/id/eprint/14096 |
Actions (login required)
![]() |
View Item |
