YOHANA NONI, 1115011111 (2015) STUDI PERPINDAHAN (DISPLACEMENT) PONDASI TIANG PADA GEDUNG BERTINGKAT. Fakultas Teknik, Universitas Lampung.
|
File PDF
ABSTRACT.pdf Download (6Kb) | Preview |
|
|
File PDF
ABSTRAK.pdf Download (7Kb) | Preview |
|
|
File PDF
COVER DALAM.pdf Download (7Kb) | Preview |
|
|
File PDF
COVER DEPAN.pdf Download (14Kb) | Preview |
|
|
File PDF
DAFTAR GAMBAR.pdf Download (8Kb) | Preview |
|
|
File PDF
DAFTAR ISI.pdf Download (10Kb) | Preview |
|
|
File PDF
DAFTAR TABEL.pdf Download (7Kb) | Preview |
|
|
File PDF
MENGESAHKAN.pdf Download (727Kb) | Preview |
|
|
File PDF
MOTO.pdf Download (87Kb) | Preview |
|
|
File PDF
MENYETUJUI.pdf Download (754Kb) | Preview |
|
|
File PDF
PERSEMBAHAN.pdf Download (19Kb) | Preview |
|
|
File PDF
RIWAYAT HIDUP.pdf Download (18Kb) | Preview |
|
|
File PDF
SANWACANA.pdf Download (18Kb) | Preview |
|
|
File PDF
SURAT PERNYATAAN.pdf Download (699Kb) | Preview |
|
|
File PDF
BAB I.pdf Download (10Kb) | Preview |
|
|
File PDF
BAB II.pdf Download (234Kb) | Preview |
|
|
File PDF
BAB III.pdf Download (13Kb) | Preview |
|
File PDF
BAB IV.pdf Restricted to Hanya pengguna terdaftar Download (911Kb) |
||
|
File PDF
BAB V.pdf Download (17Kb) | Preview |
|
|
File PDF
DAFTAR PUSTAKA.pdf Download (8Kb) | Preview |
Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)
Penelitian ini dilakukan untuk mempelajari dan mengetahui perpindahan (displacement) yang terjadi pada pondasi tiang. Studi ini menggunakan data sekunder, yakni data tanah, data struktur dan data pondasi dari bangunan hotel yang terletak di Jalan Rasuna Said no. 18 Teluk Betung, Bandar Lampung. Dalam penelitian ini, data struktur diolah menggunakan program SAP2000. Berdasarkan nilai perhitungan dari pengolahan data struktur pada program tersebut maka dilanjutkan dengan melakukan perhitungan terhadap daya dukung serta perpindahan (displacement) pondasi tiang. Diameter pondasi yang digunakan yaitu 1 m dan 2 m dengan kedalaman kurang dari 8 m. Perhitungan perpindahan pondasi dilakukan dengan menggunakan metode konvensional dan metode Broms. Dari hasil penelitian, didapat nilai perpindahan dengan dua metode tersebut. Masing masing nilai perpindahan adalah sebagai berikut. Perhitungan metode konvensional pada tiang dengan diameter 1 m didapat nilai perpindahan sebesar 0,5 mm pada diameter 2 m didapat nilai perpindahan sebesar 0,03 mm sedangkan dengan metode Broms pada diameter 1 m didapat nilai perpindahan sebesar 5,7 mm dan pada diameter 2 m didapat nilai perpindahan sebesar 1,7 mm. Dari hasil yang ada, dapat disimpulkan bahwa pada perhitungan perpindahan tiang dengan metode konvensional dan metode Broms didapat hasil yang aman dimana menurut Mc Nulty nilai perpindahan yang aman adalah kurang dari 6 mm. Kata kunci : perpindahan (displacement) pondasi, konvensional, Broms. ABSTRAK BAHASA INGGRIS This research was conducted to study and determine the displacement occurring on pile foundation. This study uses secondary data, its soil data, the structure and foundations of the hotel building located at Jalan Rasuna Said no. 18 Teluk Betung, Bandar Lampung. In this study, the data structure is processed using SAP2000 program. Based on the calculation of the value of the data processing structure in the program then continued with calculation of carrying capacity as well as the displacement pile. Diameter of foundation used is 1 m and 2 m with a depth of less than 8 m. Foundation displacement calculation is done using the conventional method and the method Broms. From the research, the displacement values obtained with the two methods. Each value of displacement is as follows. Conventional methods of calculation on a pole with a diameter of 1 m obtained displacement value of 0.5 mm in diameter 2 m obtained displacement value of 0.03 mm, while the method Broms in diameter 1 m obtained displacement value of 5.7 mm and the diameter of 2 m obtained value of the displacement of 1.7 mm. From the results, it can be concluded that the calculation of the pole shift with the conventional method and the method of safe Broms obtained results where, according to Mc Nulty safe transfer value is less than 6 mm. Keywords: displacement foundation, conventional, Broms.
Jenis Karya Akhir: | Skripsi |
---|---|
Subyek: | > Q Science (General) |
Program Studi: | Fakultas Teknik > Prodi S1-Teknik Sipil |
Pengguna Deposit: | 7529232 . Digilib |
Date Deposited: | 22 Dec 2015 06:36 |
Terakhir diubah: | 22 Dec 2015 06:36 |
URI: | http://digilib.unila.ac.id/id/eprint/16105 |
Actions (login required)
Lihat Karya Akhir |