Afrizal Fitriandi, 1015031065 (2015) MONITORING ARUS DAN TEGANGAN BERBASIS MIKROKONTROLER DENGAN SMS GETEWAY PADA JARINGAN HIBRID DUSUN MARGOSARI KABUPATEN PESAWARAN. FAKULTAS TEKNIK, UNIVERSITAS LAMPUNG.
|
Text
1. COVER.pdf Download (40kB) | Preview |
|
|
Text
2. ABSTRACT.pdf Download (7kB) | Preview |
|
|
Text
3. ABSTRAK.pdf Download (7kB) | Preview |
|
|
Text
4. COVER DALAM.pdf Download (41kB) | Preview |
|
|
Text
5. LEMBAR PERSETUJUAN.pdf Download (432kB) | Preview |
|
|
Text
6. LEMBAR PENGESAHAN.pdf Download (351kB) | Preview |
|
|
Text
7. PERNYATAAN.pdf Download (309kB) | Preview |
|
|
Text
8. RIWAYAT HIDUP.pdf Download (107kB) | Preview |
|
|
Text
9. PERSEMBAHAN.pdf Download (211kB) | Preview |
|
|
Text
10. MOTO.pdf Download (179kB) | Preview |
|
|
Text
11. SANWACANA.pdf Download (206kB) | Preview |
|
|
Text
13. DAFTAR TABEL.pdf Download (86kB) | Preview |
|
|
Text
14. DAFTAR GAMBAR.pdf Download (91kB) | Preview |
|
|
Text
6. DAFTAR PUSTAKA.pdf Download (201kB) | Preview |
|
|
Text
12. DAFTAR ISI.pdf Download (96kB) | Preview |
|
|
Text
1. BAB I.pdf Download (110kB) | Preview |
|
|
Text
2. BAB II.pdf Download (654kB) | Preview |
|
|
Text
3. BAB III.pdf Download (812kB) | Preview |
|
|
Text
4. BAB IV.pdf Restricted to Registered users only Download (848kB) |
||
|
Text
5. BAB V.pdf Download (6kB) | Preview |
|
|
Text
6. DAFTAR PUSTAKA.pdf Download (201kB) | Preview |
Abstract
Kebutuhan energi listrik masyarakat semakin meningkat, namun ketersediaan energi belum dapat memenuhi kebutuhan masyarakat. Kondisi ini mendorong masyarakat untuk membangun sistem pembangkit listrik sendiri seperti Pembangkit Listrik Tenaga Mikrohidro (PLTMH) dan Pembangkit Listrik Tenaga Surya (PLTS). Energi listrik yang dihasilkan oleh pemangkit ini bergantung pada kondisi alam dan cuaca, hal ini menyebabkan pembangkitan energi yang dihasilkan terbatas karenanya dibutuhkan suatu sistem untuk menggabungkan pembangkit listrik alternatif ini menjadi satu jaringan yang dapat memenuhi kebutuhan listrik bagi masyarakat. Penggabungan sistem pembangkit ini yang disebut hibrid sistem tenaga listrik, hal ini sudah dilakukan di Dusun Margosari Kabupaten Pesawaran. Hibrid pembangkit alternatif akan menambah suplai energi listrik ke beban, hal tersebut perlu dilakukan monitoring arus dan tegangan. Untuk memudahkan memonitoring arus dan tegangan maka dibuat alat monitoring arus dan tegangan berbasis mikrokontroler dengan sms gateway. Pada sistem hibrid, PLTS dan PLTMH yang digabungkan untuk menyuplai beban di Dusun Margosari kabupaten pesawaran, monitoring arus dan tegangan di monitoring secara berkala melalui jaringan telekomunikasi dengan sms setiap 5 menit. Tegangan tertinggi sebelum di hibrid diperoleh sebesar 132 volt dan terendah 92 volt. Setelah dilakukan sistem hibrid PLTMH dan PLTS diperoleh tegangan tertinggi sebesar 149 volt dan terendah 98,8 volt. Kondisi ini dapat memperbaiki tegangan sebesar 19%. Abstract Electrical energy needs of society is increasing, but the availability of energy can not meet the needs of the community. These conditions encourage people to build their own power generation systems such as micro hydro power plant and Solar Power. The electrical energy produced by these plants depends on the nature and weather conditions, this causes the generation of energy generated is limited therefore needed a system to combine alternative power generation is becoming a network that can meet the electricity needs for the community. Incorporation generating system is called hybrid power systems, this is already done in the hamlet Margosari Pesawaran district. Hybrid alternative power plant will increase the supply of electrical energy to the load, it is necessary to monitor the current and voltage. To facilitate the monitoring of current and voltage then made current and voltage monitoring tool based microcontroller with sms gateway. In the hybrid system, solar power plant and microhydro power plant are coupled to supply the load in Dusun Margosari Kabupaten Pesawaran, monitoring current and voltage at periodic monitoring via telecommunications networks by sms every 5 minutes. The highest voltage before in hybrid obtained at 132 volts and 92 volts lows. After the hybrid system of the microhydro power plant and solar power plant obtained the highest voltage of 149 volts and the lowest is 98.8 volts. This condition can improve the voltage by 19%.
| Item Type: | Other |
|---|---|
| Subjects: | Teknologi > Teknik Elektro. Rekayasa elektronik Nuklir Teknologi > Teknik Elektro. Rekayasa elektronik Nuklir |
| Divisions: | Fakultas Teknik > Prodi Teknik Elektro |
| Depositing User: | 9426096 . Digilib |
| Date Deposited: | 11 Jan 2016 02:50 |
| Last Modified: | 11 Jan 2016 02:50 |
| URI: | http://digilib.unila.ac.id/id/eprint/16735 |
Actions (login required)
![]() |
View Item |
