ANALISIS PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) STUDI KASUS: SUNGAI AIR ANAK (HULU SUNGAI WAY BESAI)

VERY DWIYANTO , 1115011109 (2016) ANALISIS PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) STUDI KASUS: SUNGAI AIR ANAK (HULU SUNGAI WAY BESAI). UNIVERSITAS LAMPUNG, FAKULTAS TEKNIK.

[img]
Preview
File PDF
ABSTRAK (ABSTRACT).pdf

Download (9Kb) | Preview
[img] File PDF
SKRIPSI FULL.pdf
Restricted to Hanya pengguna terdaftar

Download (2282Kb)
[img]
Preview
File PDF
SKRIPSI TANPA BAB PEMBAHASAN.pdf

Download (1869Kb) | Preview

Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)

Penelitian ini dilakukan dengan tujuan untuk menghitung penurunan daya listrik yang dapat dihasilkan oleh Pembangkit Listrik Tenaga Mikro Hidro yang ada di sungai Air Anak. Penurunan daya listrik pada PLTMH sungai Air Anak ini diakibatkan oleh adanya sedimen yang menumpuk pada bendung PLTMH, sehingga berkurangnya debit air yang dapat dialirkan ke pipa penstock untuk membangkitkan daya listrik. Dalam penelitian ini, dilakukan perhitungan debit andalan Sungai Air Anak dengan perbandingan debit andalan Sungai Way Besai yang didapat dari pengolahan data debit yang tercatat pada waduk PLTA Way Besai selama 11 tahun dari tahun 2004 sampai dengan tahun 2014 dengan menggunakan metode FDC (Flow Duration Curve), perhitungan daya listrik terbangkit dari debit rencana pada PLTMH Air Anak, perhitungan penurunan daya listrik pada PLTMH Air Anak. Dari hasil penilitian, didapat nilai debit rencana PLTMH Air Anak adalah sebesar 0,2565 m3/s dengan daya terbangkit sebesar 2,3742 kW. Penurunan daya dihitung berdasarkan pengukuran yang dilakukan sebanyak 2 kali. Pada debit terukur sungai sebesar 1,1923 m3/s, air yang dapat dialirkan ke pipa setinggi 7 cm menghasilkan debit sebesar 0,0592 m3/s. Daya yang dapat dihasilkan sebesar 1,2326 kW atau sebesar 56,12% dari daya terbangkit rencana. Pada debit terukur sungai sebesar 0,5788 m3/s, air yang dapat dialirkan ke pipa setinggi 4 cm menghasilkan debit sebesar 0,0189 m3/s. Daya tidak dapat lagi dihasilkan karena debit tersebut tidak dapat lagi memutar turbin. Kata kunci : mikro hidro, grafik durasi aliran, daya listrik abstract This research was conducted in order to calculate the reduction in electrical power that can be generated by a micro-hydro power plant in Air Anak river. The decline in power at the micro-hydro power plant Air Anak river is caused by the presence of sediments that accumulate in the weir of micro-hydro power plants, so that reduced water storage that can be flowed to a penstock pipe to generate electrical power. In this study, dependable discharge of Air Anak river is carried out by comparing dependable discharge of Way Besai river which was calculated based on discharge data recorder at the hydroelectric plant reservoirs Way Besai for 11 years from 2004 to 2014 using FDC Methode. In addition, this study also analyse the electricity power generated from the design discharge at micro-hydro power plant Air Anak and analyse the decline electrical power at the micro-hydro power plant Air Anak. From the research, the design discharge value obtained for micro-hydro power plant Air Anak is 0.2565 m3/s with power generated is 2.37422 kW. Power reduction is calculated based on measurements taken 2 times. In streamflow measured at 1.1923 m3/s, water which can flow into the pipe is 7 cm so that it generates a discharge of 0.0592 m3/s. Power that can be generated is 1.2326 kW or 56.12% of the generated design power. In streamflow measured at 0,5788 m3/s, water which can flow into the pipe is 4 cm so that it generates a discharge of 0.0189 m3/s. Power can’t longer be generated due to the discharge can’t longer turn a turbine. Keywords : micro hydro, flow duration curve, electrical power

Jenis Karya Akhir: Skripsi
Subyek: > Teknologi (General)
> Teknologi (General)
Teknologi (General)
Program Studi: Fakultas Teknik > Prodi S1-Teknik Sipil
Pengguna Deposit: 40941694 . Digilib
Date Deposited: 24 Jun 2016 01:21
Terakhir diubah: 24 Jun 2016 01:21
URI: http://digilib.unila.ac.id/id/eprint/22833

Actions (login required)

Lihat Karya Akhir Lihat Karya Akhir