ANALISIS PENEMPATAN THYRISTOR CONTROLLED SERIES COMPENSATOR (TCSC) PADA SALURAN BUKIT KEMUNING – BATURAJA DI SISTEM TENAGA LISTRIK LAMPUNG

ARI ALFIAN, 0915031025 (2016) ANALISIS PENEMPATAN THYRISTOR CONTROLLED SERIES COMPENSATOR (TCSC) PADA SALURAN BUKIT KEMUNING – BATURAJA DI SISTEM TENAGA LISTRIK LAMPUNG. FAKULTAS TEKNIK, UNIVERSITAS LAMPUNG.

[img]
Preview
File PDF
ABSTRAK (ABSTRACT).pdf

Download (15Kb) | Preview
[img] File PDF
SKRIPSI FULL.pdf
Restricted to Hanya pengguna terdaftar

Download (2981Kb)
[img]
Preview
File PDF
SKRIPSI TANPA BAB PEMBAHASAN.pdf

Download (2195Kb) | Preview

Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)

ABSTRAK Thyristor Controlled Series Compensator (TCSC) adalah kompensator seri berbasis FACTS yang bertujuan untuk mengatur aliran daya aktif pada suatu saluran transmisi. Dengan mengatur aliran daya pada suatu saluran transmisi dapat mengatur kebutuhan daya aktif pada beban yang terhubung pada bus penerima atau bus pengirim atau bus-bus lain yang berdekatan atau dengan kata lain mengatur kemampuan suatu saluran transmisi dalam mengirim daya aktif. Tujuan dari penelitian tugas akhir ini adalah menganalisa penempatan TCSC pada saluran transmisi antara bus Baturaja dan Bukit Kemuning di sistem tenaga listrik wilayah Lampung. Analisis dilakukan dengan mengubah-ubah besar nilai reaktansi Xtcsc dengan mengubah-ubah nilai induktansi yang paralel dengan suatu kapasitor dengan besar nilai yang tetap. Perhitungan aliran daya dilakukan dengan menggunakan software Matpower 5.1 yang berbasis bahasa pemrograman MATLAB. Hasil penelitian ini menggunakan analisa aliran daya pada saluran Bukit Kemuning – Baturaja di sistem tenaga listrik Lampung dengan aplikasi Matpower 5.1. Pengujian dilakukan dengan memasang kapasitor tetap dengan nilai XC= 0,05 pu dan XC=0,06 pu dan nilai induktansi paralel XL diubah-ubah. Hasil pengujian menunjukkan bahwa aliran daya pada saluran juga berubah-ubah. Penempatan TCSC saat bekerja pada daerah kapasitif menyebabkan tegangan naik pada bus-bus yang berdekatan dengan bus Baturaja dan bus Bukit Kemuning. Sebaliknya, saat TCSC bekerja pada daerah induktif mengakibatkan tegangan turun pada bus-bus yang berdekatan dengan bus-bus tersebut. Oleh karena itu dalam pemasangan TCSC perlu memperhatikan batasan – batasan nilai variabel dari Xc dan XL agar tidak menyebabkan jatuh tegangan pada bus penerima maupun pengirim. Kata kunci : Thyristor Controlled Series Compensator, Penempatan, Sistem Tenaga Listrik Lampung. ABSTRACT Thyristor Controlled Series Compensator (TCSC) is FACTS-based series compensator which aims to regulate the active power flow on a transmission line. By regulating the power flow in a transmission line can be set active power requirements of the load connected to the receiving bus or to sending bus or to other adjacent buses or otherwise regulate the ability of a power transmission line in the sending of active power. The purpose of this thesis was to analyze the placement of TCSC on the transmission line between the bus Baturaja and Bukit Kemuning in the Lampung’s electric power system. The analysis is performed by changing the reactance value of Xtcsc by changing the value of inductance in parallel with a fixed capacitor value. Power flow calculations performed using Matpower 5.1 software based on MATLAB programming language. The results of this study using analysis of power flow in the Bukit Kemuning – Baturaja line in Lampung’s electric power systems with Matpower 5.1 applications. Testing is performed by installing fixed capacitors with the value of XC = 0.05 p.u. and XC = 0.06 p.u. and parallel inductance value XL is altered. The test results indicate that the power flow in the line is also changing. Placement TCSC which working on a capacitive zone causes the voltage increase on buses adjacent to the bus Baturaja and the bus Bukit Kemuning. Conversely, when the TCSC working on inductive zone resulting voltage drop in buses adjacent to these buses. Hence, in the TCSC installation need to consider the limits of the variable values of Xc and XL in order not to cause a voltage drop on the receiving bus and sending bus. Keywords: Thyristor Controlled Series Compensator, Placement, Lampung’s Electric Power System

Jenis Karya Akhir: Skripsi
Subyek: > Teknik Elektro. Rekayasa elektronik Nuklir
> Teknik Elektro. Rekayasa elektronik Nuklir
Program Studi: Fakultas Teknik > Prodi S1-Teknik Elektro
Pengguna Deposit: 9355504 . Digilib
Date Deposited: 23 Aug 2016 03:42
Terakhir diubah: 23 Aug 2016 03:42
URI: http://digilib.unila.ac.id/id/eprint/23542