PRARANCANGAN PABRIK FRUKTOSA DARI TEPUNG TAPIOKA KAPASITAS 33.000 TON/TAHUN (Perancangan Evaporator (EV-501))

DEBORA SEPTANIA PURBA , 1015041027 (2016) PRARANCANGAN PABRIK FRUKTOSA DARI TEPUNG TAPIOKA KAPASITAS 33.000 TON/TAHUN (Perancangan Evaporator (EV-501)). FAKULTAS TEKNIK , UNIVERSITAS LAMPUNG.

[img]
Preview
File PDF
ABSTRACT (ABSTRAK).pdf

Download (13Kb) | Preview
[img]
Preview
File PDF
SKRIPSI TANPA BAB PEMBAHASAN.pdf

Download (3607Kb) | Preview
[img]
Preview
File PDF
SKRIPSI FULL.pdf

Download (3607Kb) | Preview

Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)

Pabrik fruktosa berbahan baku singkong, akan didirikan di Tulang Bawang Barat, Bandar Lampung. Pabrik ini berdiri dengan mempertimbangkan ketersediaan bahan baku, sarana transportasi yang memadai, tenaga kerja yang mudah didapatkan dan kondisi lingkungan. Pabrik direncanakan memproduksi maltosa sebanyak 50.000 ton/tahun, dengan waktu operasi 24 jam/hari, 330 hari/tahun. Bahan baku yang digunakan adalah singkong sebanyak 18.521,46 kg/jam. Jumlah karyawan sebanyak 186 orang dengan bentuk perusahaan adalah Perseroan Terbatas (PT) menggunakan struktur organisasi line dan staff. Dari analisis ekonomi diperoleh: Fixed Capital Investment (FCI) = Rp. 204.267.510.077,22,- Working Capital Investment (WCI) = Rp. 68.089.170.025,74,- Total Capital Investment (TCI) = Rp. 272.356.680.102,96,- Break Even Point (BEP) = 39,99% Shut Down Point (SDP) = 28,29% Pay Out Time after Taxes (POT)a = 0,86 tahun Return on Investment after Taxes (ROI)a = 31,85 % Internal Rate Return (IRR) = 87 % Annual Net Profit (Pa) = Rp. 66.892.516.864,-/tahun Mempertimbangkan paparan di atas, sudah selayaknya pendirian pabrik fruktosa ini dikaji lebih lanjut, karena merupakan pabrik yang menguntungkan dan mempunyai masa depan yang baik. ABSTRACT A plant to produce fructose from tapioca flour is planned to be located at West Tulang Bawang, Bandar Lampung. The plant is established by considering availability of raw materials, transportation facilities, readily available labor and environmental conditions. Capacity of the plant is 33.000 tons/year operating 24 hour/day and 330 working days/ year. The plant required 11.251,330 kg/hr tapioca flour. Quantity of labor is around 186 people. The plant is managed as a Limited Liability Company (PT), which is headed by a Director who is assisted by a Director of Production and Director of Finance. The company is organized in the form of line and staff structure. From analysis of the plant economy is obtained: Fixed Capital Investment (FCI) = Rp. 204.267.510.077,22,- Working Capital Investment (WCI) = Rp. 68.089.170.025,74,- Total Capital Investment (TCI) = Rp. 272.356.680.102,96,- Break Even Point (BEP) = 39,99% Shut Down Point (SDP) = 28,29% Pay Out Time after Taxes (POT)a = 0,86 years Return on Investment after Taxes (ROI)a = 31,85 % Internal Rate Return (IRR) = 87 % Annual Net Profit (Pa) = Rp. 66.892.516.864,-/year By considering above the summary, it is suitable study further the maltose plant since plant is profitable and has good prospects.

Jenis Karya Akhir: Skripsi
Subyek: > Q Science (General)
Program Studi: Fakultas Teknik > Prodi S1-Teknik Kimia
Pengguna Deposit: 1403026 . Digilib
Date Deposited: 26 Sep 2016 06:32
Terakhir diubah: 26 Sep 2016 06:32
URI: http://digilib.unila.ac.id/id/eprint/23852

Actions (login required)

Lihat Karya Akhir Lihat Karya Akhir