PRARANCANGAN PABRIK MAGNESIUM CARBONATE DARI MAGNESIUM CHLORIDE DAN SODIUM CARBONATE KAPASITAS 30.000 TON/TAHUN

ABDUL AZIZ AHMAD , 1015041001 (2017) PRARANCANGAN PABRIK MAGNESIUM CARBONATE DARI MAGNESIUM CHLORIDE DAN SODIUM CARBONATE KAPASITAS 30.000 TON/TAHUN. FAKULTAS TEKNIK, UNIVERSITAS LAMPUNG.

[img]
Preview
FIle PDF
ABSTRAK.pdf

Download (35Kb) | Preview
[img] FIle PDF
SKRIPSI FULL.pdf
Restricted to Hanya pengguna terdaftar

Download (9Mb)
[img]
Preview
FIle PDF
SKRIPSI TANPA BAB PEMBAHASAN.pdf

Download (9Mb) | Preview

Abstrak

ABSTRAK Pabrik Sodium magnesium carbonate berbahan baku magnesium chloride dan sodium carbonate direncanakan didirikan di Serang, Banten. Pendiriaan pabrik berdasarkan atas pertimbangan belum terdapatnya pabrik magnesium carbonate di Indonsia, k e t e r s e d i a a n b a h a n b a k u , sarana transportasi yang memadai, tenaga kerja yang mudah didapatkan dan kondisi lingkungan. Pabrik direncanakan memproduksi magnesium carbonate sebanyak 30.000 ton/tahun, dengan waktu operasi 24 jam/hari, 330 hari/tahun. Bahan baku yang digunakan adalah magnesium chloride sebanyak 4.680,0959 kg/jam dan sodium carbonate sebanyak 5.105,6833 kg/jam. Penyediaan kebutuhan utilitas pabrik terdiri dari unit pengadaan air, pengadaan udara instrument, pengadaan udara panas, pengadaan listrik, pengadaan refrigerant dan pengolahan limbah. Bentuk perusahaan adalah Perseroan Terbatas (PT) menggunakan struktur organisasi line dan staff dengan jumlah karyawan sebanyak 162 orang. Dari analisis ekonomi diperoleh: Fixed Capital Investment (FCI) = Rp. 315.905.57.016,95,- Working Capital Investment (WCI) = Rp. 55.748/041,70,- Total Capital Investment (TCI) = Rp. 371.653.611.784,6,- Break Even Point (BEP) = 38,12% Shut Down Point (SDP) = 23,82% Pay Out Time before taxes Pay Out Time after taxes Return on Investment before taxes (POT)b (POT)a (ROI)b = = = 2,63 tahun 2,9 tahun 43,40% Return on Investment after taxes (ROI)a = 34,72% Discounted cash flow (DCF) = 28,45% Mempertimbangkan paparan di atas, sudah selayaknya pendirian pabrik ma g n e s i um c a r b o n a e ini dikaji lebih lanjut, karena merupakan pabrik yang menguntungkan dan mempunyai masa depan yang baik. ABSTRACT Magnesium carbonate plant with materials, magnesium chloride and sodium carbonate is planned to be built in Serang, Banten. Establishment of this plant is based on some consideration due to the raw material resourcess, the transportation, the labors availability and also the environmental condition. This plant is meant to produce 30.000 tons/year magnesium carbonate with operation time 24 hour/day, 330 hour/year. Raw materials used consist of 4.680,0959 kg/hour of magnesium chloride, 5.105,6833 kg/hour of sodium carbonate. The utility units consist of water supply system, instrument air supply system, power generation system, refrigerant supply system and waste treatment system. The bussines entity form is Limited Liability Company (Ltd) using line and staff organizational structure with 162 labors. From the economic analysis, it is obtained that: Fixed Capital Investment (FCI) = Rp. 315.905.57.016,95,- Working Capital Investment (WCI) = Rp. 55.748/041,70,- Total Capital Investment (TCI) = Rp. 371.653.611.784,6,- Break Even Point (BEP) = 38,12% Shut Down Point (SDP) = 23,82% Pay Out Time before taxes Pay Out Time after taxes Return on Investment before taxes (POT)b (POT)a (ROI)b = = = 2,63 year 2,9 year 43,40 % Return on Investment after taxes (ROI)a = 34,72 % Discounted cash flow (DCF) = 28,45 % Considering the summary above, it is proper to study the establishment of Magnesium carbonate plant further, because the plant is profitable and has good prospects.

Jenis Karya Akhir: Skripsi
Subyek: > QD Chemistry
> Teknologi (General)
> Teknologi (General)
Teknologi (General)
Program Studi: Fakultas Teknik > Prodi S1-Teknik Kimia
Pengguna Deposit: 9517505 . Digilib
Date Deposited: 06 Mar 2017 05:03
Terakhir diubah: 06 Mar 2017 05:03
URI: http://digilib.unila.ac.id/id/eprint/25974

Actions (login required)

Lihat Karya Akhir Lihat Karya Akhir