SELVIA RAHMA RIZKIA, 1215011099 (2017) ANALISIS PERBANDINGAN KEHILANGAN PRATEGANG AKIBAT METODE STRESSING SATU ARAH DAN DUA ARAH PADA JEMBATAN BETON PRATEGANG. FAKULTAS TEKNIK, UNVIERSITAS LAMPUNG.
|
File PDF
ABSTRAK.pdf Download (15Kb) | Preview |
|
File PDF
SKRIPSI FULL.pdf Restricted to Hanya pengguna terdaftar Download (8Mb) |
||
|
File PDF
SKRIPSI TANPA BAB PEMBAHASAN.pdf Download (1516Kb) | Preview |
Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)
Jembatan beton prategang adalah suatu struktur konstruksi yang menghubungkan suatu tempat ke tempat lainnya yang dibuat dengan cara memberikan tegangan yang berlawanan dengan tegangan yang diakibatkan oleh beban eksternal. Proses pemberian tegangan dapat dilakukan sebelum beton dicetak (pratarik) atau setelah beton dicetak (pascatarik). Pemberian tegangan pada beton prategang pascatarik dapat dilakukan dengan dua metode, yaitu stressing satu arah dan dua arah. Pemberian tegangan dengan menggunakan kedua metode stressing mengakibatkan kehilangan gaya prategang yang berbeda pada beton. Tujuan dari penelitian ini adalah untuk mengetahui bagaimana pengaruh metode stressing satu arah dan dua arah terhadap kehilangan prategang. Analisis yang dilakukan yaitu menghitung gaya prategang, menentukan jumlah dan lintasan tendon, menghitung kehilangan prategang akibat metode stressing satu arah dan dua arah, serta kontrol tegangan dan lendutan pada girder. Jenis girder yang digunakan pada penelitian ini adalah PC I girder, PC U girder dan box girder. Dari hasil analisis didapatkan hasil kehilangan prategang metode stressing satu arah pada PC I girder sebesar 30,826%, PC U girder sebesar 30,3401% dan box girder sebesar 31,8852%. Kehilangan prategang metode stressing dua arah pada PC I girder sebesar 29,8397%, PC U girder sebesar 29,3169% dan box girder sebesar 31,4955%. Dapat disimpulkan bahwa kehilangan prategang pada girder yang menggunakan metode stressing satu arah lebih besar dibandingkan kehilangan prategang pada girder yang menggunakan metode stressing dua arah. Kata kunci : beton prategang, metode stressing, satu arah, dua arah. abstract A prestressed concrete bridge is a construction structure bridging one location to another location and this is made by stressing strands with opposite force caused by the external loading. The stressing process can be done before the concrete is molded (pre-tensioning) and after the concrete is molded (post-tensioning). The stressing in the prestressed post-tensioning concrete can be done with two methods; the one way and two ways stressing. Stressing by using these two stressing methods may cause different prestress force loss in the concrete. The objective of this research was to find out the influence of one way and two ways stressing methods to the prestress force loss, analysis was conducted by estimating prestress forces, determining amounts and lines of stranded-wire tendons, estimating pre-stress force loss because of one way and two ways stressing methods and force controlling and deflection in the girder. This research used PC I girder, PC U girder, and box girder types. The analysis results showed that the prestress force loss in the one way stressing method in PC I girder was 30.826%, 30.3401% in PC U girder, and 31.885% in box girder. The prestress force loss in two ways stressing method was 29.8397% in PC I girder, 29.3169% in PC U girder, and 31.4955% in box girder. The conclusion was that the prestress force loss in the girder by using one way stressing method was bigger than in two ways stressing method. Keywords: prestress concrete, stressing method, one way, two ways
Jenis Karya Akhir: | Skripsi |
---|---|
Subyek: | > Teknologi (General) > Teknologi (General) Teknologi (General) |
Program Studi: | Fakultas Teknik > Prodi S1-Teknik Sipil |
Pengguna Deposit: | 68793249 . Digilib |
Date Deposited: | 04 Aug 2017 06:32 |
Terakhir diubah: | 04 Aug 2017 06:32 |
URI: | http://digilib.unila.ac.id/id/eprint/27722 |
Actions (login required)
Lihat Karya Akhir |