MUHAMAD WAHIDI, 0915031061 (2014) UNBALANCED THREE-PHASE POWER FLOW ANALYSIS AT THE KANGKUNG’S DISTRIBUTION FEEDER PT. PLN (PERSERO) DISTRIBUTION LAMPUNG ANALISA ALIRAN DAYA TIGA FASA TAK SEIMBANG PADA PENYULANG KANGKUNG PT. PLN (PERSERO) DISTRIBUSI LAMPUNG. Fakultas Teknik, Universitas Lampung.
|
File PDF
ABSTRACT.pdf Download (82Kb) | Preview |
|
|
File PDF
ABSTRAK.pdf Download (72Kb) | Preview |
|
|
File PDF
COVER LUAR.pdf Download (106Kb) | Preview |
|
|
File PDF
COVER DALAM.pdf Download (47Kb) | Preview |
|
|
File PDF
HALAMAN PERSETUJUAN.pdf Download (4Mb) | Preview |
|
|
File PDF
HALAMAN PENGESAHAN.pdf Download (4Mb) | Preview |
|
|
File PDF
PERNYATAAN.pdf Download (2077Kb) | Preview |
|
|
File PDF
RIWAYAT HIDUP.pdf Download (83Kb) | Preview |
|
|
File PDF
MOTTO.pdf Download (52Kb) | Preview |
|
|
File PDF
PERSEMBAHAN.pdf Download (47Kb) | Preview |
|
|
File PDF
SANWACANA.pdf Download (88Kb) | Preview |
|
|
File PDF
DAFTAR ISI.pdf Download (108Kb) | Preview |
|
|
File PDF
DAFTAR TABEL.pdf Download (99Kb) | Preview |
|
|
File PDF
DAFTAR GAMBAR.pdf Download (104Kb) | Preview |
|
|
File PDF
BAB I.pdf Download (150Kb) | Preview |
|
|
File PDF
BAB II.pdf Download (362Kb) | Preview |
|
|
File PDF
BAB III.pdf Download (627Kb) | Preview |
|
File PDF
BAB IV.pdf Restricted to Hanya pengguna terdaftar Download (796Kb) |
||
|
File PDF
BAB V.pdf Download (88Kb) | Preview |
|
|
File PDF
DAFTAR PUSTAKA.pdf Download (92Kb) | Preview |
Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)
Power flow analysis is the basis of power system planning, design and operation. This is also true in the case of electric power distribution system where imbalances occur among the three phases both for voltages and currents. This situation needs to be carefully analyzed and a three phase power flow analysis has to be done. In this work, a three phase power flow software is developed and used to analyze unbalanced distribution system of PT. PLN (Persero) Distribusi Lampung at Kangkung Feeder supplying Menggala, Simpang Asahan and Wiralaga Areas. The three phase power flow developed in this work is based on Newton-Rhapson rectangular coordinates which is expected to be superior than the Newton-Rhapson polar representations. The obtained results are then compared to the available commercial power system analysis software, i.e. ETAP. The developed software tool is shown to be comparable and produces outputs similar to ETAP. However, better convergence characteristics are also observed. Simulations are carried out in two scenarios i.e. a base case where the actual loading on the feeder is applied and then planning case where additional generator is installed in the system to improve voltage quality. For the first case, the developed program solves the problem within 18 iterations while ETAP requires 50 iterations to finish. For the latter case, only 3 iterations are required by the developed program to complete the computation while ETAP requires 7 iterations. Studi aliran daya merupakan tulang punggung dari perencanaan operasi sistem tenaga. Dalam proses penyaluran aliran daya tiga fasa khususnya pada jaringan distribusi sering terjadi ketidakseimbangan baik di tegangan maupun di arus. Dalam tugas akhir ini, simulasi aliran daya tiga fasa tak seimbang digunakan untuk menganalisa ketidakseimbangan pada sistem distribusi Penyulang Kangkung PT. PLN (Persero) Distribusi Lampung yang menyuplai daerah Menggala, Simpang Asahan dan Wiralaga. Aliran daya tiga fasa tak seimbang ini menggunakan Newton-Rhapson rectangular yang diharapkan mampu lebih unggul dari Newton-Rhapson polar. Hasil yang diperoleh kemudian akan dibandingkan dengan perangkat lunak analisa power system berbayar yaitu ETAP. Perangkat lunak yang dikembangkan ini terbukti sebanding dan menghasilkan output yang mirip dengan ETAP. Namun, karakteristik konvergensi yang lebih baik juga diamati. Simulasi yang dilakukan dibagi dalam dua tahap yaitu studi kasus pada penyulang yang ada dan kemudian studi kasus dimana pembangkit tambahan dipasang dalam sistem untuk meningkatkan kualitas tegangan. Untuk kasus pertama , program yang dikembangkan memecahkan masalah dalam 18 iterasi, sementara ETAP membutuhkan 50 iterasi untuk menyelesaikannya. Untuk kasus terakhir, hanya 3 iterasi yang diperlukan oleh program yang dikembangkan untuk menyelesaikan perhitungan, sementara ETAP membutuhkan 7 iterasi.
Jenis Karya Akhir: | Skripsi |
---|---|
Subyek: | > Karya Karya Umum = 000 |
Program Studi: | Fakultas Teknik > Prodi S1-Teknik Elektro |
Pengguna Deposit: | UPT Perpustakaan Unila |
Date Deposited: | 02 Oct 2014 03:45 |
Terakhir diubah: | 02 Oct 2014 03:45 |
URI: | http://digilib.unila.ac.id/id/eprint/3750 |
Actions (login required)
Lihat Karya Akhir |