PRARANCANGAN PABRIK FURFURIL ALKOHOL DARI FURFURAL DAN HIDROGEN KAPASITAS 20.000 TON/TAHUN (Tugas Khusus Reaktor 01 (RE-201))

Diki Prayogo, 0715041036 (2014) PRARANCANGAN PABRIK FURFURIL ALKOHOL DARI FURFURAL DAN HIDROGEN KAPASITAS 20.000 TON/TAHUN (Tugas Khusus Reaktor 01 (RE-201)). Fakultas Teknik, Universitas Lampung.

[img]
Preview
File PDF
COVER DALAM.pdf

Download (336Kb) | Preview
[img]
Preview
File PDF
ABSTRAK.pdf

Download (9Kb) | Preview
[img]
Preview
File PDF
ABSTRACT.pdf

Download (11Kb) | Preview
[img]
Preview
File PDF
LEMBAR PERSETUJUAN.pdf

Download (800Kb) | Preview
[img]
Preview
File PDF
LEMBAR PENGESAHAN.pdf

Download (813Kb) | Preview
[img]
Preview
File PDF
LEMBAR PERNYATAAN.pdf

Download (372Kb) | Preview
[img]
Preview
File PDF
RIWAYAT HIDUP.pdf

Download (82Kb) | Preview
[img]
Preview
File PDF
PERSEMBAHAN.pdf

Download (26Kb) | Preview
[img]
Preview
File PDF
MOTO.pdf

Download (59Kb) | Preview
[img]
Preview
File PDF
SANWACANA.pdf

Download (79Kb) | Preview
[img]
Preview
File PDF
DAFTAR ISI.pdf

Download (14Kb) | Preview
[img]
Preview
File PDF
DAFTAR TABEL.pdf

Download (93Kb) | Preview
[img]
Preview
File PDF
DAFTAR GAMBAR.pdf

Download (7Kb) | Preview
[img] File PDF
BAB 1.pdf
Restricted to Hanya pengguna terdaftar

Download (466Kb)
[img] File PDF
BAB 2.pdf
Restricted to Hanya pengguna terdaftar

Download (484Kb)
[img] File PDF
BAB 3.pdf
Restricted to Hanya pengguna terdaftar

Download (467Kb)
[img] File PDF
BAB 4.pdf
Restricted to Hanya pengguna terdaftar

Download (529Kb)
[img] File PDF
BAB 5.pdf
Restricted to Hanya pengguna terdaftar

Download (385Kb)
[img] File PDF
BAB 6.pdf
Restricted to Hanya pengguna terdaftar

Download (313Kb)
[img] File PDF
BAB 7.pdf
Restricted to Hanya pengguna terdaftar

Download (513Kb)
[img] File PDF
BAB 8.pdf
Restricted to Hanya pengguna terdaftar

Download (320Kb)
[img] File PDF
BAB 9.pdf
Restricted to Hanya pengguna terdaftar

Download (344Kb)
[img] File PDF
BAB 10.pdf
Restricted to Hanya pengguna terdaftar

Download (7Kb)
[img]
Preview
File PDF
DAFTAR PUSTAKA.pdf

Download (133Kb) | Preview

Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)

Pabrik furfuril alkohol berbahan baku furfural dan hidrogen, akan didirikan di Kebomas, Gresik - Jawa Timur. Pabrik ini berdiri dengan mempertimbangkan ketersediaan bahan baku, sarana transportasi yang memadai, tenaga kerja yang mudah didapatkan dan kondisi lingkungan. Pabrik direncanakan memproduksi furfuril alkohol sebanyak 20.000 ton/tahun, dengan waktu operasi 24 jam/hari, 330 hari/tahun. Bahan baku yang digunakan adalah furfural sebanyak 2.474,2217 kg/jam dan hidrogen sebanyak 52,4618 kg/jam. Penyediaan kebutuhan utilitas pabrik furfuril alkohol berupa : pengadaan air, pengadaan steam, pengadaan listrik, kebutuhan bahan bakar, dan pengadaan udara kering. Bentuk perusahaan adalah Perseroan Terbatas (PT) menggunakan struktur organisasi line dan staff dengan jumlah karyawan sebanyak 135 orang. Dari analisis ekonomi diperoleh: Fixed Capital Investment (FCI) = Rp 158.597.213,0830 Working Capital Investment (WCI) = Rp 27.987.743,4850 Total Capital Investment (TCI) = Rp 186.584.956,5680 Break Even Point (BEP) = 46,9259 % Shut Down Point (SDP) = 33,8764 % Pay Out Time before taxes (POT) b = 2,8265 years Pay Out Time after taxes (POT) a = 3,3000 years Return on Investment before taxes (ROI) b = 43,0100 % Return on Investment after taxes (ROI) a = 34,4100 % Discounted cash flow (DCF) = 39,8589 % Mempertimbangkan paparan di atas, sudah selayaknya pendirian pabrik furfuril alkohol ini dikaji lebih lanjut, karena merupakan pabrik yang menguntungkan dan mempunyai masa depan yang baik. Furfuryl alcohol plant produced by reacting furfural and hydrogen is planned to be in industrial factory in the region of Gresik in East Java Province. Plant will be established by considering the availability of raw materials, transportation facilities, readily available labor and environmental conditions. Production capacity is planned 20,000 tons/year, with operating time of 24 hours/day and 330 working days in a year. The raw materials used are much furfural 2.474,2217 kg/hr and hydrogen as 52,4618 kg/hr. Provision of utility plant needs a treatment system and water supply, steam supply systems, instrument air supply systems, and power generation systems. Labor needed as many as 135 people with a business entity form Limited Liability Company (PT) which is headed by a Director who is assisted by the Director of Production and Director of Finance with line and staff organizational structure. From the economic analysis is obtained: Fixed Capital Investment (FCI) = Rp 158.597.213,0830 Working Capital Investment (WCI) = Rp 27.987.743,4850 Total Capital Investment (TCI) = Rp 186.584.956,5680 Break Even Point (BEP) = 46,9259 % Shut Down Point (SDP) = 33,8764 % Pay Out Time before taxes (POT) b = 2,8265 years Pay Out Time after taxes (POT) a = 3,3000 years Return on Investment before taxes (ROI) b = 43,0100 % Return on Investment after taxes (ROI) a = 34,4100 % Discounted cash flow (DCF) = 39,8589 % Consider the summary above, it is proper establishment of furfuryl alcohol plant to studied further, because the plant is profitable and has good prospects.

Jenis Karya Akhir: Skripsi
Subyek:
> Karya Karya Umum = 000
Program Studi: Fakultas Teknik > Prodi S1-Teknik Kimia
Pengguna Deposit: 299657 . Digilib
Date Deposited: 20 Oct 2014 06:37
Terakhir diubah: 20 Oct 2014 06:37
URI: http://digilib.unila.ac.id/id/eprint/4379

Actions (login required)

Lihat Karya Akhir Lihat Karya Akhir