PRARANCANGAN PABRIK GLUKOSA DARI PATI JAGUNG DENGAN PROSES HIDROLISA ASAM KAPASITAS 100.000 TON/TAHUN (PERANCANGAN REAKTOR (RH-201))

WENNY WIDAYANI, 0715041072 (2014) PRARANCANGAN PABRIK GLUKOSA DARI PATI JAGUNG DENGAN PROSES HIDROLISA ASAM KAPASITAS 100.000 TON/TAHUN (PERANCANGAN REAKTOR (RH-201)). Fakultas Teknik, Universitas Lampung.

[img]
Preview
Text
ABSTRAK.pdf

Download (7Kb) | Preview
[img]
Preview
Text
ABSTRACT.pdf

Download (7Kb) | Preview
[img]
Preview
Text
COVER.pdf

Download (306Kb) | Preview
[img]
Preview
Text
HALAMAN PERSETUJUAN.pdf

Download (620Kb) | Preview
[img]
Preview
Text
HALAMAN PENGESAHAN.pdf

Download (587Kb) | Preview
[img]
Preview
Text
PERNYATAAN.pdf

Download (405Kb) | Preview
[img]
Preview
Text
RIWAYAT HIDUP.pdf

Download (64Kb) | Preview
[img]
Preview
Text
PERSEMBAHAN.pdf

Download (174Kb) | Preview
[img]
Preview
Text
SANWACANA.pdf

Download (131Kb) | Preview
[img]
Preview
Text
DAFTAR ISI.pdf

Download (51Kb) | Preview
[img]
Preview
Text
DAFTAR TABEL.pdf

Download (69Kb) | Preview
[img]
Preview
Text
DAFTAR GAMBAR.pdf

Download (4Kb) | Preview
[img]
Preview
Text
BAB I.pdf

Download (297Kb) | Preview
[img] Text
BAB II.pdf
Restricted to Registered users only

Download (93Kb)
[img] Text
BAB III.pdf
Restricted to Registered users only

Download (138Kb)
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (98Kb)
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (510Kb)
[img] Text
BAB VI.pdf
Restricted to Registered users only

Download (396Kb)
[img] Text
BAB VII.pdf
Restricted to Registered users only

Download (236Kb)
[img] Text
BAB VIII.pdf
Restricted to Registered users only

Download (135Kb)
[img] Text
BAB IX.pdf
Restricted to Registered users only

Download (199Kb)
[img]
Preview
Text
BAB X.pdf

Download (6Kb) | Preview
[img]
Preview
Text
DAFTAR PUSTAKA.pdf

Download (133Kb) | Preview

Abstrak

ABSTRAK Pabrik glukosa berbahan baku pati dan air, akan didirikan di Kabupaten lampung Tengah, Provinsi Lampung. Pabrik ini berdiri dengan mempertimbangkan ketersediaan bahan baku, sarana transportasi yang memadai, tenaga kerja yang mudah didapatkan dan kondisi lingkungan. Pabrik direncanakan memproduksi glukosa sebanyak 100.000 ton/tahun, dengan waktu operasi 24 jam/hari, 330 hari/tahun. Bahan baku yang digunakan adalah pati sebanyak 14.841 kg/jam dan air sebanyak 21.769,62 kg/jam. Bentuk perusahaan adalah Perseroan Terbatas (PT) menggunakan struktur organisasi line dan staff dengan jumlah karyawan sebanyak 188 orang. Dari analisis ekonomi diperoleh: Fixed Capital Investment (FCI) = Rp 274.240.731.600,- Working Capital Investment (WCI) = Rp 48.395.423.050,- Total Capital Investment (TCI) = Rp 322.636.153.600,- Break Even Point (BEP) = 47,78% Pay Out Time before Taxes (POT)b = 2,33 tahun Pay Out Time after Taxes (POT)a = 2,75 tahun Return on Investment before Taxes (ROI)b = 28,03 % Return on Investment after Taxes (ROI)a = 22,42% Discounted Cash Flow (DCF) = 58 % Shut Down Point (SDP) = 24,32% Mempertimbangkan paparan di atas, sudah selayaknya pendirian pabrik glukosa ini dikaji lebih lanjut, karena merupakan pabrik yang menguntungkan dan mempunyai masa depan yang baik. ABSTRACT A plant producing glucose by hydrolysis acid of corn starch and water is planned to be in industrial plant in the region of Center Lampung in Lampung Province. The plant would be Plant was established by considering the availability of raw materials, transportation facilities, readily available labor and environmental conditional. Plants production capacity is planned for 100.000 tons/year, with operating time of 24 hours/day and 330 working days in year. The raw materials used are corn starch as 14.841 kg/hr and water 21.769,62 kg/hr. Provision of utility plant needs a treatment system and water supply, steam supply systems, instrument air supply systems, and power generation systems. The total amount of labor needed is as much as 188 people with a business entity form Limited Liability Company (PT) which is headed by a Director who is assisted by the Director of Production and Director of Finance with line and staff organizational structure. Fixed Capital Investment (FCI) = Rp 274.240.731.600,- Working Capital Investment (WCI) = Rp 48.395.423.050,- Total Capital Investment (TCI) = Rp 322.636.153.600,- Break Even Point (BEP) = 47,78% Pay Out Time before Taxes (POT)b = 2,33 year Pay Out Time after Taxes (POT)a = 2,75 year Return on Investment before Taxes (ROI)b = 28,03 % Return on Investment after Taxes (ROI)a = 22,42% Discounted Cash Flow (DCF) = 58 % Shut Down Point (SDP) = 24,32% By consider all the summaries, it is propere to do a further about the establishment of this glucose plant, because the plant could be profitable with good prospects.

Tipe Karya Ilmiah: Skripsi
Subyek: A General Works = Karya Karya Umum
Program Studi: Fakultas Teknik > Prodi Teknik Kimia
Depositing User: 4058838 . Digilib
Date Deposited: 03 Dec 2014 08:07
Last Modified: 03 Dec 2014 08:07
URI: http://digilib.unila.ac.id/id/eprint/5549

Actions (login required)

View Item View Item