PRARANCANGAN PABRIK MALEIC ANHYDRIDE DARI OKSIDASI N-BUTANA OLEH UDARA KAPASITAS 20.000 TON/TAHUN (Perancangan Reaktor ( RE-201))

ZULFA FAUZIYYAH, 1215041057 (2019) PRARANCANGAN PABRIK MALEIC ANHYDRIDE DARI OKSIDASI N-BUTANA OLEH UDARA KAPASITAS 20.000 TON/TAHUN (Perancangan Reaktor ( RE-201)). FAKULTAS TEKNIK, UNIVERSITAS LAMPUNG.

[img]
Preview
File PDF
ABSTRAK.pdf

Download (34Kb) | Preview
[img] File PDF
SKRIPSI FULL.pdf
Restricted to Hanya staf

Download (3326Kb)
[img]
Preview
File PDF
SKRIPSI TANPA BAB PEMBAHASAN.pdf

Download (2019Kb) | Preview

Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)

Pabrik Maleic Anhydride berbahan baku n-butana dan oksigen, akan didirikan di Cilacap, Jawa Tengah. Pabrik ini berdiri dengan mempertimbangkan ketersediaan bahan baku, sarana transportasi yang memadai, tenaga kerja yang mudah didapatkan dan kondisi lingkungan. Pabrik direncanakan memproduksi Maleic Anhydride sebanyak 20.000 ton/tahun, dengan waktu operasi 24 jam/hari, 330 hari/tahun. Bahan baku yang digunakan adalah n-butana sebanyak 2.116,50 kg/jam dan Vanadium phosphorus oxcide sebanyak 29.186,5629 kg/jam. Penyediaan kebutuhan utilitas pabrik Maleic Anhydride berupa: pengadaan air, pengadaan listrik, kebutuhan bahan bakar, dan pengadaan udara kering. Bentuk perusahaan adalah Perseroan Terbatas (PT) menggunakan struktur organisasi line dan staff dengan jumlah karyawan sebanyak 137 orang. Dari analisis ekonomi diperoleh: Fixed Capital Investment (FCI) = Rp 440.396.823.280,- Working Capital Investment (WCI) = Rp 77.717.086.461,- Total Capital Investment (TCI) = Rp 518.113,909.742,- Break Even Point (BEP) = 50,29 % Pay Out Time before Taxes (POT)b = 2,49 tahun Pay Out Time after Taxes (POT)a = 2,93 tahun Return on Investment before Taxes (ROI)b = 25,62 % Return on Investment after Taxes (ROI)a = 20,49 % Discounted Cash Flow (DCF) = 16,379% Shut Down Point (SDP) = 27,44 % Mempertimbangkan paparan di atas, sudah selayaknya pendirian pabrik Maleic anhydride ini dikaji lebih lanjut, karena merupakan pabrik yang menguntungkan dan mempunyai masa depan yang baik. Maleic Anhydride plant produced by reacting benzene dan oxygen was plan to be in industrial plant in the region of Cilacap, in Central Java Province. Plant was established by considering the availability of raw materials, transportation facilities, readily available labor and environmental conditions. Plant's production capacity is planned 20,000 tons / year, with operating time of 24 hours / day and 330 working days in a year. The raw materials used are much n-butana 2.116,50 kg / hr and Vanadium phosphorus oxcide as 29.186,5629 kg / hr. Provision of utility plant needs a treatment system and water supply, steam supply systems, instrument air supply systems, and power generation systems. Labor needed as many as 137 people with a business entity form Limited Liability Company (PT) which is headed by a Director who is assisted by the Director of Production and Director of Finance with line and staff organizational structure. From the economic analysis is obtained: Fixed Capital Investment (FCI) = Rp 440.396.823.280,- Working Capital Investment (WCI) = Rp 77.717.086.461,- Total Capital Investment (TCI) = Rp 518.113,909.742,- Break Even Point (BEP) = 50,29 % Pay Out Time before Taxes (POT)b = 2,49 tahun Pay Out Time after Taxes (POT)a = 2,93 tahun Return on Investment before Taxes (ROI)b = 25,62 % Return on Investment after Taxes (ROI)a = 20,49 % Discounted Cash Flow (DCF) = 16,379% Shut Down Point (SDP) = 27,44 % Consider the summary above, it is proper establishment of Maleic anhydride plant to studied further, because the plant is profitable and has good prospects.

Jenis Karya Akhir: Skripsi
Subyek: 600 Teknologi (ilmu terapan) > 620 Ilmu teknik dan ilmu yang berkaitan
Program Studi: Fakultas Teknik > Prodi S1-Teknik Kimia
Pengguna Deposit: UPT . Teti Novianti
Date Deposited: 31 Mar 2022 10:28
Terakhir diubah: 31 Mar 2022 10:28
URI: http://digilib.unila.ac.id/id/eprint/57000

Actions (login required)

Lihat Karya Akhir Lihat Karya Akhir