PRARANCANGAN PABRIK NORMAL BUTIRALDEHID DARI PROPILEN, KARBONMONOKSIDA, DAN HIDROGEN DENGAN KATALIS RHODIUM-TRIPENILPOSPIN DENGAN KAPASITAS 30.000 TON/TAHUN (Perancangan Distillation Column (DC-101))

Ulfa Islamia, 1615041023 (2021) PRARANCANGAN PABRIK NORMAL BUTIRALDEHID DARI PROPILEN, KARBONMONOKSIDA, DAN HIDROGEN DENGAN KATALIS RHODIUM-TRIPENILPOSPIN DENGAN KAPASITAS 30.000 TON/TAHUN (Perancangan Distillation Column (DC-101)). FAKULTAS TEKNIK, UNIVERSITAS LAMPUNG.

[img]
Preview
File PDF
1. ABSTRAK - ulfa islamia.pdf

Download (15Kb) | Preview
[img] File PDF
2. SKRIPSI FULL (REVISI) - ulfa islamia.pdf
Restricted to Hanya staf

Download (3527Kb)
[img]
Preview
File PDF
3. SKRIPSI FULL TANPA BAB PEMBAHASAN (REVISI 2) - ulfa islamia.pdf

Download (1959Kb) | Preview

Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)

Pabrik normal butiraldehid berbahan baku propilen, karbonmonoksida, dan hidrogen, akan didirikan di Warnasari, Kec. Citangkil, Kota Cilegon, Banten. Pabrik ini berdiri dengan mempertimbangkan ketersediaan bahan baku, sarana transportasi yang memadai, tenaga kerja yang mudah didapatkan dan kondisi lingkungan. Pabrik direncanakan memproduksi dekstrin sebanyak 30.000 ton/tahun, dengan waktu operasi 24 jam/hari, 330 hari/tahun. Bahan baku yang digunakan adalah propilen sebanyak 2.509,06 kg/jam; hidrogen sebanyak 131,44 kg/jam dan karbonmonoksida 1.840,16 kg//jam. Jumlah karyawan sebanyak 139 orang dengan bentuk perusahaan adalah Perseroan Terbatas (PT) menggunakan struktur organisasi line dan staff. Dari analisis ekonomi diperoleh: Fixed Capital Investment (FCI) = Rp 567.586.739.192,-Working Capital Investment (WCI) = Rp 100.162.365.740,-Total Capital Investment (TCI) = Rp 667.749.104.932 ,-Break Even Point (BEP) = 41,92% Shut Down Point (SDP) = 20,05% Pay Out Time after Taxes (POT)a = 3,1 tahun Return on Investment after Taxes (ROI)a = 19,00% Internal Rate Return (IRR) = 24,99% Mempertimbangkan paparan di atas, sudah selayaknya pendirian pabrik normal butiraldehid ini dikaji lebih lanjut, karena merupakan pabrik yang menguntungkan dan mempunyai masa depan yang baik. A plant to produce normal butyraldehyde from propylene, hydrogen, carbonmonoxide is planned to be located at Warnasari, Kec. Citangkil, Kota Cilegon, Banten. The plant is established by considering availability of raw materials, transportation facilities, readily available labor and environmental conditions. Capacity of the plant is 30.000 tons/year operating 24 hour/day and 330 working days/ year. The plant required 2.509,06 kg/h propylene; 131,44 kg/h hydrogen and 1.840,16 kg/h carbonmonoxide. Quantity of labor is around 139 people. The plant is managed as a Limited Liability Company (PT), which is headed by a Director who is assisted by a Director of Production and Director of Finance. The company is organized in the form of line and staff structure. From analysis of the plant economy is obtained: Fixed Capital Investment (FCI) = Rp 567.586.739.192,-Working Capital Investment (WCI) = Rp 100.162.365.740,-Total Capital Investment (TCI) = Rp 667.749.104.932 ,-Break Even Point (BEP) = 41,92% Shut Down Point (SDP) = 20,05% Pay Out Time after Taxes (POT)a = 3,1 tahun Return on Investment after Taxes (ROI)a = 19,00% Internal Rate Return (IRR) = 24,99% By considering above the summary, it is suitable study further the normal butyraldehydes plant since plant is profitable and has good prospects.

Jenis Karya Akhir: Skripsi
Subyek: 600 Teknologi (ilmu terapan)
600 Teknologi (ilmu terapan) > 660 Teknik kimia
Program Studi: Fakultas Teknik > Prodi S1-Teknik Kimia
Pengguna Deposit: UPT Anita Ekarini
Date Deposited: 18 May 2022 08:44
Terakhir diubah: 18 May 2022 08:44
URI: http://digilib.unila.ac.id/id/eprint/61257

Actions (login required)

Lihat Karya Akhir Lihat Karya Akhir