PERBANDINGAN HASIL PERHITUNGAN VOLUME OPRIT JEMBATAN MENGGUNAKAN METODE KONTUR DAN DIGITAL ELEVATION MODEL (DEM) PADA BENDUNGAN WAY SEKAMPUNG KABUPATEN PRINGSEWU PAKET IV

ISMAIL MAHMUD, 1805061022 (2022) PERBANDINGAN HASIL PERHITUNGAN VOLUME OPRIT JEMBATAN MENGGUNAKAN METODE KONTUR DAN DIGITAL ELEVATION MODEL (DEM) PADA BENDUNGAN WAY SEKAMPUNG KABUPATEN PRINGSEWU PAKET IV. [Diploma/Tugas Akhir]

[img]
Preview
File PDF
ABSTRAK.pdf

Download (1880Kb) | Preview
[img] File PDF
TUGAS AKHIR FULL.pdf
Restricted to Hanya staf

Download (2166Kb)
[img]
Preview
File PDF
TUGAS AKHIR TANPA BAB PEMBAHASAN.pdf

Download (1882Kb) | Preview

Abstrak

Oprit merupakan aktivitas pekerjaan timbunan tanah di belakang abutment jembatan, timbunan merupakan salah satu bagian terpenting dalam berbagai jenis proyek pengukuran. Perhitungan timbunan merupakan salah satu permasalahan yang ekstensif dan kompleks, oleh karena itu perhitungan volume timbunan harus dilakukan seteliti mungkin agar tidak ada pihak yang dirugikan. Dalam tugas akhir ini, dilakukan perhitungan volume timbunan pada jembatan bendungan Way Sekampung Kabupaten Pringsewu paket IV. Memanfaatkan data MC-0 dan MC-100 dan DEM. Kemudian dilakukan perhitungan untuk mengetahui selisih hasil perhitungan volume terhadap volume asli. Pada metode kontur diperoleh selisih 0,33% dan 0,14% terhadap volume asli sedangkan menggunakan DEM diperoleh selisih 0,91% dan 0,78% terhadap volume asli. Kata kunci : Oprit, MC-0, MC-100, DEM Oprit is an embankment work activity behind the bridge abutment, embankment is one of the most important parts in various types of measurement projects. The calculation of the embankment is one of the extensive and complex problems, therefore the calculation of the volume of the embankment must be carried out as accurately as possible so that no party is harmed. In this final project, the volume of embankment is calculated on the dam bridge way in the village of Pringsewu Regency, Package IV. Utilize MC-0 and MC-100 and DEM data. Then the calculation is carried out to determine the difference between the results of the volume calculation and the original volume. In the contour method, the difference is 0,33% and 0,14% to the original volume, while using DEM the difference is 0,91% and 0,78% to the original volume. Keywords: Oprit, MC-0, MC-100, DEM

Jenis Karya Akhir: Diploma/Tugas Akhir
Subyek: 600 Teknologi (ilmu terapan)
Program Studi: Fakultas Teknik > Prodi D3-Survey Dan Pemetaan
Pengguna Deposit: 2203592628 . Digilib
Date Deposited: 28 Jun 2022 01:15
Terakhir diubah: 28 Jun 2022 01:15
URI: http://digilib.unila.ac.id/id/eprint/63948

Actions (login required)

Lihat Karya Akhir Lihat Karya Akhir