ANALISIS PERBANDINGAN VOLUME STOCKPILE BATUBARA MENGGUNAKAN PERANGKAT LUNAK SURPAC 6.5.1 DAN MINESCAPE 5.7 DENGAN DATA TRUCK COUNT ( Studi Kasus : PT. Mahakarya Bangun Persada Lahat, Sumatra Selatan)

Sari, Linda (2023) ANALISIS PERBANDINGAN VOLUME STOCKPILE BATUBARA MENGGUNAKAN PERANGKAT LUNAK SURPAC 6.5.1 DAN MINESCAPE 5.7 DENGAN DATA TRUCK COUNT ( Studi Kasus : PT. Mahakarya Bangun Persada Lahat, Sumatra Selatan). [Diploma/Tugas Akhir]

[img]
Preview
File PDF
ABSTRAK.pdf

Download (881Kb) | Preview
[img] File PDF
TA FULL.pdf
Restricted to Hanya staf

Download (3231Kb) | Minta salinan
[img]
Preview
File PDF
TA FULL TANPA BAB PEMBAHASAN.pdf

Download (3006Kb) | Preview

Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)

PT. Mahakarya Bangun Persada (MBP) merupakan salah satu perusahaan tambang batubara yang beroperasi di Sumatera Selatan. Dalam melakukan operasi pertambangan terdapat area penyimpanan batubara yang disebut stockpile. Monitoring secara periodik perlu dilakukan sebagai kontrol dalam manajemen stockpile. Salah satunya perhitungan volume maka dari itu dilakukannya analisis perhitungan volume mengggunakan 2 software yang berbeda agar dapat mengetahui hasil dari setiap software yang berbeda. Dengan metode cut and fill yang sering digunakan dalam kegiatan penambangan batubara dengan cara melakukan perhitungan luasan dua penampang exsisting dan rencana (original ground surface dan surface design), serta jarak antara penampang atas dan penampang bawah (thickness) yang akan diolah menggunakan software Minescape 5.7 dan Surpac 6.5.1. Setelah dilakukan perhitungan volume maka dilanjutkan dengan analisis perbandingan hasil volume dari software dan data truck count dengan hasil truck count 2.275 Ton, software surpac 2.577,41 Ton dan software minescape 2.602,23 Ton. Hasil dari perhitungan volume stockpile menggunakan data survey dan data truck count terdapat selisih software surpac 11,73% dan software minescape 12,57%. Dari hasil penelitian ini dapat dianalisis ada beberapa faktor penyebab perbedaan antara hasil volume software dan data truck count, diantaranya masingmasing software memberikan informasi hasil hitungan volume yang berbeda. Meski menggunakan metode yang sama karena dalam pembuatan software memiliki rumus hitungan tersendiri dalam pembuatannya walaupun menggunakan metode yang sama dalam perhitungan volume pasti hasilnya akan berbeda. Kata Kunci: Stockpile, surpac, minescape, truck count dan volume. PT. Mahakarya Bangun Persada (MBP) is a coal mining company operating in South Sumatra. In carrying out mining operations there is a coal storage area called a stockpile. Periodic monitoring needs to be done as a control in stockpile management. One of them is the volume calculation, therefore an analysis of volume calculations is carried out using 2 different software so that you can find out the results of each different software. With the cut and fill method which is often used in coal mining activities by calculating the area of two existing sections and plans (original ground surface and surface design), as well as the distance between the upper and lower sections (thickness) which will be processed using Minescape 5.7 software and Surpac 6.3. After calculating the volume, it is followed by a comparative analysis of the volume results from the software and truck count data with the results obtained by the surpac software 494 Kg and minescape software -381 Kg. From the results of this study, it can be analyzed that there are several factors that cause differences between the results of volume software and truck count data, including that each software provides information on the results of different volume counts. Even though using the same method because in making software it has its own calculation formula in making it even though using the same method in calculating volume the results will definitely be different. Keywords: Stockpile, surpac, minescape, truck count and volume.

Jenis Karya Akhir: Diploma/Tugas Akhir
Subyek: 600 Teknologi (ilmu terapan)
600 Teknologi (ilmu terapan) > 690 Pembangunan gedung
Program Studi: Fakultas Teknik > Prodi D3-Survey Dan Pemetaan
Pengguna Deposit: 2301974084 . Digilib
Date Deposited: 11 Aug 2023 08:43
Terakhir diubah: 11 Aug 2023 08:43
URI: http://digilib.unila.ac.id/id/eprint/74550

Actions (login required)

Lihat Karya Akhir Lihat Karya Akhir