Manuel Siregar, 0915041034 (2015) PRARANCANGAN PABRIK KALSIUM HIDROKSIDA DARI KALSIUM OKSIDA DAN AIR KAPASITAS 30.000 TON/TAHUN (Perancangan Menara Distilasi (D-201)). Fakultas Teknik, Universitas Lampung.
|
File PDF
ABSTRAK.pdf Download (9Kb) | Preview |
|
|
File PDF
ABSTRACT.pdf Download (9Kb) | Preview |
|
|
File PDF
COVER DALAM.pdf Download (54Kb) | Preview |
|
|
File PDF
HALAMAN PERSETUJUAN.pdf Download (107Kb) | Preview |
|
|
File PDF
HALAMAN PENGESAHAN.pdf Download (106Kb) | Preview |
|
|
File PDF
PERNYATAAN.pdf Download (85Kb) | Preview |
|
|
File PDF
RIWAYAT HIDUP.pdf Download (97Kb) | Preview |
|
|
File PDF
MOTTO.pdf Download (40Kb) | Preview |
|
|
File PDF
SANWACANA.pdf Download (99Kb) | Preview |
|
|
File PDF
DAFTAR ISI.pdf Download (17Kb) | Preview |
|
|
File PDF
DAFTAR TABEL.pdf Download (114Kb) | Preview |
|
|
File PDF
DAFTAR GAMBAR.pdf Download (6Kb) | Preview |
|
|
File PDF
BAB I.pdf Download (457Kb) | Preview |
|
|
File PDF
BAB II.pdf Download (378Kb) | Preview |
|
|
File PDF
BAB III.pdf Download (103Kb) | Preview |
|
File PDF
BAB IV.pdf Restricted to Hanya pengguna terdaftar Download (133Kb) |
||
File PDF
BAB V.pdf Restricted to Hanya pengguna terdaftar Download (591Kb) |
||
File PDF
BAB VI.pdf Restricted to Hanya pengguna terdaftar Download (417Kb) |
||
File PDF
BAB VII.pdf Restricted to Hanya pengguna terdaftar Download (67Kb) |
||
File PDF
BAB VIII.pdf Restricted to Hanya pengguna terdaftar Download (258Kb) |
||
File PDF
BAB IX.pdf Restricted to Hanya pengguna terdaftar Download (303Kb) |
||
|
File PDF
BAB X.pdf Download (84Kb) | Preview |
|
|
File PDF
DAFTAR PUSTAKA.pdf Download (183Kb) | Preview |
Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)
Abstrak Pabrik Kalsium Hidroksida berbahan baku Kalsium Oksida dan Air, direncanakan didirikan di Gresik, Jawa Timur. Pendiriaan pabrik berasarkan atas pertimbangan akan ketersediaan bahan baku, sarana transportasi yang memadai, tenaga kerja yang mudah didapatkan dan kondisi lingkungan. Pabrik direncanakan memproduksi Kalsium Hidroksida sebanyak 30.000 ton/tahun, dengan waktu operasi 24 jam/hari, 333 hari/tahun. Bahan baku yang digunakan adalah Kalsium Oksida sebanyak 2990.5752 kg/jam dan Air sebanyak 1152.8933 kg/jam. Penyediaan kebutuhan utilitas pabrik terdiri dari unit pengadaan air, pengadaan listrik, udara instrument, pengadaan steam. Bentuk perusahaan adalah Perseroan Terbatas (PT) menggunakan struktur organisasi line dan staff dengan jumlah karyawan sebanyak 163 orang. Dari analisis ekonomi diperoleh: Fixed Capital Investment (FCI) = Rp 205,740,256,298.81 Working Capital Investment (WCI) = Rp 36,307,104,052.73 Total Capital Investment (TCI) = Rp 242,047,360,351.54 Break Even Point (BEP) = 35.93 % Shut Down Point (SDP) = 23.21 % Pay Out Time before taxes (POT)b = 1.3 Tahun Pay Out Time after taxes (POT)a = 1.58 Tahun Return on Investment before taxes (ROI)b = 56.68 % Return on Investment after taxes (ROI)a = 45.35 % Discounted cash flow (DCF) = 48 % Mempertimbangkan paparan di atas, sudah selayaknya pendirian pabrik Kalsium Hidroksida ini dikaji lebih lanjut, karena merupakan pabrik yang menguntungkan dan mempunyai masa depan yang baik. Abstract Calcium Hydroxide plant with raw materials, calcium oxide and water is planned to be built in Gresik, East Java. Establishment of this plant is based on some consideration due to the raw material resourcess, the transportation, the labors availability and also the environmental condition. This plant is meant to produce 30,000 tons/year with 333 working days in a year. The raw materials used consist of 2990.5752 kg/hour of calcium oxide and 1152.8933 kg/hour of water. The utility units consist of water supply system, power generation system, instrumentation & control system and steam supply system. The bussines entity form is Limited Liability Company (Ltd) using line and staff organizational structure with 163 labors. From the economic analysis, it is obtained that: Fixed Capital Investment (FCI) = Rp 205,740,256,298.81 Working Capital Investment (WCI) = Rp 36,307,104,052.73 Total Capital Investment (TCI) = Rp 242,047,360,351.54 Break Even Point (BEP) = 35.93 % Shut Down Point (SDP) = 23.21 % Pay Out Time before taxes (POT)b = 1.3 Year Pay Out Time after taxes (POT)a = 1.58 Year Return on Investment before taxes (ROI)b = 56.68 % Return on Investment after taxes (ROI)a = 45.35 % Discounted cash flow (DCF) = 48 % Considering the summary above, it is proper to study the establishment of Calcium Hydroxide plant further, because the plant is profitable and has good prospects.
Jenis Karya Akhir: | Skripsi |
---|---|
Subyek: | > > |
Program Studi: | Fakultas Teknik > Prodi S1-Teknik Kimia |
Pengguna Deposit: | 6882650 . Digilib |
Date Deposited: | 23 Apr 2015 08:04 |
Terakhir diubah: | 23 Apr 2015 08:04 |
URI: | http://digilib.unila.ac.id/id/eprint/8799 |
Actions (login required)
Lihat Karya Akhir |