PRARANCANGAN PABRIK KALSIUM HIDROKSIDA DARI KALSIUM OKSIDA DAN AIR KAPASITAS 30.000 TON/TAHUN (Perancangan Menara Distilasi (D-201))

Manuel Siregar, 0915041034 (2015) PRARANCANGAN PABRIK KALSIUM HIDROKSIDA DARI KALSIUM OKSIDA DAN AIR KAPASITAS 30.000 TON/TAHUN (Perancangan Menara Distilasi (D-201)). Fakultas Teknik, Universitas Lampung.

[img]
Preview
Text
ABSTRAK.pdf

Download (9Kb) | Preview
[img]
Preview
Text
ABSTRACT.pdf

Download (9Kb) | Preview
[img]
Preview
Text
COVER DALAM.pdf

Download (54Kb) | Preview
[img]
Preview
Text
HALAMAN PERSETUJUAN.pdf

Download (107Kb) | Preview
[img]
Preview
Text
HALAMAN PENGESAHAN.pdf

Download (106Kb) | Preview
[img]
Preview
Text
PERNYATAAN.pdf

Download (85Kb) | Preview
[img]
Preview
Text
RIWAYAT HIDUP.pdf

Download (97Kb) | Preview
[img]
Preview
Text
MOTTO.pdf

Download (40Kb) | Preview
[img]
Preview
Text
SANWACANA.pdf

Download (99Kb) | Preview
[img]
Preview
Text
DAFTAR ISI.pdf

Download (17Kb) | Preview
[img]
Preview
Text
DAFTAR TABEL.pdf

Download (114Kb) | Preview
[img]
Preview
Text
DAFTAR GAMBAR.pdf

Download (6Kb) | Preview
[img]
Preview
Text
BAB I.pdf

Download (457Kb) | Preview
[img]
Preview
Text
BAB II.pdf

Download (378Kb) | Preview
[img]
Preview
Text
BAB III.pdf

Download (103Kb) | Preview
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (133Kb)
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (591Kb)
[img] Text
BAB VI.pdf
Restricted to Registered users only

Download (417Kb)
[img] Text
BAB VII.pdf
Restricted to Registered users only

Download (67Kb)
[img] Text
BAB VIII.pdf
Restricted to Registered users only

Download (258Kb)
[img] Text
BAB IX.pdf
Restricted to Registered users only

Download (303Kb)
[img]
Preview
Text
BAB X.pdf

Download (84Kb) | Preview
[img]
Preview
Text
DAFTAR PUSTAKA.pdf

Download (183Kb) | Preview

Abstrak

Abstrak Pabrik Kalsium Hidroksida berbahan baku Kalsium Oksida dan Air, direncanakan didirikan di Gresik, Jawa Timur. Pendiriaan pabrik berasarkan atas pertimbangan akan ketersediaan bahan baku, sarana transportasi yang memadai, tenaga kerja yang mudah didapatkan dan kondisi lingkungan. Pabrik direncanakan memproduksi Kalsium Hidroksida sebanyak 30.000 ton/tahun, dengan waktu operasi 24 jam/hari, 333 hari/tahun. Bahan baku yang digunakan adalah Kalsium Oksida sebanyak 2990.5752 kg/jam dan Air sebanyak 1152.8933 kg/jam. Penyediaan kebutuhan utilitas pabrik terdiri dari unit pengadaan air, pengadaan listrik, udara instrument, pengadaan steam. Bentuk perusahaan adalah Perseroan Terbatas (PT) menggunakan struktur organisasi line dan staff dengan jumlah karyawan sebanyak 163 orang. Dari analisis ekonomi diperoleh: Fixed Capital Investment (FCI) = Rp 205,740,256,298.81 Working Capital Investment (WCI) = Rp 36,307,104,052.73 Total Capital Investment (TCI) = Rp 242,047,360,351.54 Break Even Point (BEP) = 35.93 % Shut Down Point (SDP) = 23.21 % Pay Out Time before taxes (POT)b = 1.3 Tahun Pay Out Time after taxes (POT)a = 1.58 Tahun Return on Investment before taxes (ROI)b = 56.68 % Return on Investment after taxes (ROI)a = 45.35 % Discounted cash flow (DCF) = 48 % Mempertimbangkan paparan di atas, sudah selayaknya pendirian pabrik Kalsium Hidroksida ini dikaji lebih lanjut, karena merupakan pabrik yang menguntungkan dan mempunyai masa depan yang baik. Abstract Calcium Hydroxide plant with raw materials, calcium oxide and water is planned to be built in Gresik, East Java. Establishment of this plant is based on some consideration due to the raw material resourcess, the transportation, the labors availability and also the environmental condition. This plant is meant to produce 30,000 tons/year with 333 working days in a year. The raw materials used consist of 2990.5752 kg/hour of calcium oxide and 1152.8933 kg/hour of water. The utility units consist of water supply system, power generation system, instrumentation & control system and steam supply system. The bussines entity form is Limited Liability Company (Ltd) using line and staff organizational structure with 163 labors. From the economic analysis, it is obtained that: Fixed Capital Investment (FCI) = Rp 205,740,256,298.81 Working Capital Investment (WCI) = Rp 36,307,104,052.73 Total Capital Investment (TCI) = Rp 242,047,360,351.54 Break Even Point (BEP) = 35.93 % Shut Down Point (SDP) = 23.21 % Pay Out Time before taxes (POT)b = 1.3 Year Pay Out Time after taxes (POT)a = 1.58 Year Return on Investment before taxes (ROI)b = 56.68 % Return on Investment after taxes (ROI)a = 45.35 % Discounted cash flow (DCF) = 48 % Considering the summary above, it is proper to study the establishment of Calcium Hydroxide plant further, because the plant is profitable and has good prospects.

Tipe Karya Ilmiah: Skripsi
Subyek: Teknologi >
Teknologi >
Program Studi: Fakultas Teknik > Prodi S1-Teknik Kimia
Depositing User: 6882650 . Digilib
Date Deposited: 23 Apr 2015 08:04
Last Modified: 23 Apr 2015 08:04
URI: http://digilib.unila.ac.id/id/eprint/8799

Actions (login required)

View Item View Item