Andani Diah Arum Savitri, 0815041021 (2015) Prarancangan Pabrik Paraldehida dari Asetaldehida dengan Katalis Asam Sulfat dan Asam Fosfat Kapasitas 21.000 ton/tahun. Fakultas Teknik, Universitas Lampung.
|
Text
ABSTRACT.pdf Download (10kB) | Preview |
|
|
Text
ABSTRAK.pdf Download (9kB) | Preview |
|
|
Text
COVER DALAM.pdf Download (10kB) | Preview |
|
|
Text
COVER DEPAN.pdf Download (19kB) | Preview |
|
|
Text
DAFTAR GAMBAR.pdf Download (6kB) | Preview |
|
|
Text
DAFTAR ISI.pdf Download (15kB) | Preview |
|
|
Text
DAFTAR TABEL.pdf Download (20kB) | Preview |
|
|
Text
MENGESAHKAN.pdf Download (180kB) | Preview |
|
|
Text
MENYETUJUI.pdf Download (200kB) | Preview |
|
|
Text
MOTO.pdf Download (102kB) | Preview |
|
|
Text
PERSEMBAHAN.pdf Download (19kB) | Preview |
|
|
Text
RIWAYAT HIDUP.pdf Download (12kB) | Preview |
|
|
Text
SANWACANA.pdf Download (12kB) | Preview |
|
|
Text
SURAT PERNYATAAN.pdf Download (258kB) | Preview |
|
|
Text
BAB I.pdf Download (48kB) | Preview |
|
|
Text
BAB II.pdf Download (320kB) | Preview |
|
|
Text
bab III.pdf Download (24kB) | Preview |
|
|
Text
BAB IV.pdf Download (195kB) | Preview |
|
|
Text
BAB V.pdf Restricted to Registered users only Download (220kB) |
||
|
Text
BAB VI.pdf Download (80kB) | Preview |
|
|
Text
BAB VII.pdf Restricted to Registered users only Download (153kB) |
||
|
Text
Bab VIII.pdf Restricted to Registered users only Download (255kB) |
||
|
Text
BAB IX.pdf Restricted to Registered users only Download (89kB) |
||
|
Text
Bab X.pdf Download (7kB) | Preview |
|
|
Text
DAFTAR PUSTAKA.pdf Download (13kB) | Preview |
|
|
Text
DAFTAR ISI.pdf Download (15kB) | Preview |
Abstract
ABSTRAK PRARANCANGAN PABRIK PARALDEHIDA DARI ASETALDEHIDA DENGAN KATALIS ASAM SULFAT DAN ASAM FOSFAT KAPASITAS 21.000 TON/TAHUN (Perancangan Reaktor (RE-201)) Oleh ANDANI DIAH ARUM SAVITRI Pabrik paraldehida berbahan baku asetaldehida, akan didirikan di Kawasan Industri Gresik, Gresik, Jawa Timur. Pabrik ini berdiri dengan mempertimbangkan ketersediaan bahan baku, sarana transportasi yang memadai, tenaga kerja yang mudah didapatkan dan kondisi lingkungan. Pabrik direncanakan memproduksi paraldehida sebanyak 21.000 ton/tahun, dengan waktu operasi 24 jam/hari, 330 hari/tahun. Bahan baku yang digunakan adalah asetaldehida sebanyak 2810,69 kg/jam, katalis asam sulfat sebanyak 5,62 kg/jam dan asam fosfat sebanyak 11,24 kg/jam. Jumlah karyawan sebanyak 132 orang dengan bentuk perusahaan adalah Perseroan Terbatas (PT) menggunakan struktur organisasi line dan staff. Dari analisis ekonomi diperoleh: Fixed Capital Investment (FCI) = Rp 810.504.088.778,- Working Capital Investment (WCI) = Rp 143.030.133.314,- Total Capital Investment (TCI) = Rp 953.534.222.092,- Break Even Point (BEP) = 55% Shut Down Point (SDP) = 25,97% Pay Out Time after Taxes (POT)a = 2,64 tahun Return on Investment after Taxes (ROI)a = 23,64 % Internal Rate Return (IRR) = 30,7% Annual Net Profit (Pa) = Rp 258.239.203.406/tahun Mempertimbangkan paparan di atas, sudah selayaknya pendirian pabrik paraldehida ini dikaji lebih lanjut, karena merupakan pabrik yang menguntungkan dan mempunyai masa depan yang baik. ABSTRACT PRADESIGN OF PARALDEHYDE PLANT FROM ACETALDEHYDE WITH SULFONIC ACID AND PHOSPORIC ACID CAPACITY 21.000 TONS/YEAR (Design Reactor (RE-201)) By ANDANI DIAH ARUM SAVITRI A plant to produce paraldehyde from acetaldehyde is planned to be located at Kawasan Industri Gresik, Gresik, East Java. The plant is established by considering availability of raw materials, transportation facilities, readily available labor and environmental conditions. Capacity of the plant is 21.000 tons/year operating 24 hour/day and 330 working days/ year. The plant required 2810,69 kg/hr acetaldehyde, 5,62 kg/hr sulfonic acid, and 11,24 kg/hr phosporic acid. Quantity of labor is around 132 people. The plant is managed as a Limited Liability Company (PT), which is headed by a Director who is assisted by a Director of Production and Director of Finance. The company is organized in the form of line and staff structure. From analysis of the plant economy is obtained: Fixed Capital Investment (FCI) = Rp 810.504.088.778,- Working Capital Investment (WCI) = Rp 143.030.133.314,- Total Capital Investment (TCI) = Rp 953.534.222.092,- Break Even Point (BEP) = 55% Shut Down Point (SDP) = 25,97% Pay Out Time after Taxes (POT)a = 2,64 tahun Return on Investment after Taxes (ROI)a = 23,64 % Internal Rate Return (IRR) = 30,7% Annual Net Profit (Pa) = Rp 258.239.203.406/tahun By considering above the summary, it is suitable study further the paraldehyde plant since plant is profitable and has good prospects.
| Item Type: | Other |
|---|---|
| Subjects: | A General Works = Karya Karya Umum Q Science (General) > QD Chemistry Teknologi (General) Teknologi > Teknologi (General) Teknologi > Teknologi (General) |
| Divisions: | Fakultas Teknik > Prodi Teknik Kimia |
| Depositing User: | 5997326 . Digilib |
| Date Deposited: | 04 May 2015 02:48 |
| Last Modified: | 04 May 2015 02:48 |
| URI: | http://digilib.unila.ac.id/id/eprint/9649 |
Actions (login required)
![]() |
View Item |
