<> "The repository administrator has not yet configured an RDF license."^^ . <> . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro)"^^ . "In general, the planning of a building includes the planning of the upper building\r\n(upper structure) and the planning of the lower building (sub structure). The\r\nfoundation is the part of the sub-structure that is directly related to the ground and\r\nhas an important role in bearing all the loads of other buildings on it, therefore it is\r\nnecessary to calculate the bearing capacity and settlement that will occur in the\r\ndesign planning and testing after the foundation work is carried out. In the\r\nconstruction of building B Muhammadiyah Hospital using the foundation type bored\r\npile.\r\nJudging from the investigation of soil types, structural loads, the environment around\r\nthe project, and field testing with PDA (Pile Driving Analyzer) and CAPWAP tests,\r\nthe purpose of this research is to calculate the bearing capacity and settlement\r\noffoundations bored pile in away static (using the principles of mechanics). soil)\r\nusing the theoretical method, the finite element method, and the (dynamic) method\r\nusing the experimental method with field tests of PDA (Pile Driving Analyzer) and\r\nCAPWAP tests and can interpret the results of PDA (Pile Driving Analyzer) and\r\nCAPWAP data.\r\nBased on the results of the study, it can be said that in calculating the bearing capacity\r\nof the results of the comparison of the smallest test results from the use of the L.\r\nDecourt method on the results of dynamic testing of CAPWAP results at both test\r\npoints with a value of 4.55% at point BH-01 and 9.29% at BH -02. And the smallest\r\nresult in the finite element method with CAPWAP is at point BH-01, which is 9.8%.\r\nWhere the results of the positive difference in the bearing capacity of the CAPWAP\r\ntest in the field increased more than the theoretical calculation, the dynamic testing\r\nof the bearing capacity in the field can be said to be safe.The result of the smallest\r\n\r\ndifference is the use of the Paul & Davis method on the results of CAPWAP on BH-\r\n01 which is -13% and BH-02 which is -23%. The results of the PDA Test on pile No.1\r\n\r\nare overstressed because the CSX value is higher than the allowable compressive\r\nstress, for EMX pile No.2 exceeds the recommended hammer efficiency, in the\r\nCAPWAP result report there is no information from the CAPWAP match quality and\r\nthere are data that have not been given complete in the report, such as the proportion\r\nof foundation damage (BTA) and hammer drop height (STK).\r\nKeywords: Bored Pile, Bearing Capacity and Settlement, PDA (Pile Driving Analyzer)\r\nand CAPWAP\r\nPada umumnya perencanaan suatu bangunan meliputi perencanaan bangunan atas\r\n(upper structure) dan perencanaan bangunan bawah (sub structure). Fondasi\r\nmerupakan bagian bangunan bawah (sub structure) yang berhubungan langsung\r\ndengan tanah mempunyai peranan penting memikul seluruh beban bangunan lain di\r\natasnya, maka dari itu perlu dilakukan perhitungan daya dukung serta penurunan yang\r\nakan terjadi di dalam perencanaan desain dan juga pengujian setelah pelaksanaan\r\npekerjaan fondasi. Pada pembangunan gedung B RSU Muhammadiyah\r\nmenggunakan tipe fondasi bored pile.\r\nDitinjau dari penyelidikan jenis tanah, beban struktur, lingkungan sekitar proyek, dan\r\npengujian lapangan dengan test PDA (Pile Driving Analyzer) dan CAPWAP maka\r\ntujuan dari penelitian ini adalah untuk menghitung daya dukung dan penurunan\r\nfondasi bored pile dengan cara static (menggunakan prinsip-prinsip mekanika tanah)\r\nmenggunakan metode teoritis, metode elemen hingga, dan cara (dinamic)\r\nmenggunakan metode experimental dengan uji lapangan test PDA (Pile Driving\r\nAnalyzer) dan CAPWAP serta dapat menginterpetasikan hasil data PDA (Pile\r\nDriving Analyzer) dan CAPWAP.\r\nBerdasarkan hasil dari penelitian dapat disimpulkan bahwa dalam perhitungan daya\r\ndukung hasil perbandingan selisih terkecil pengujian static menggunakan metode L.\r\nDecourt terhadap hasil pengujian dinamic hasil CAPWAP pada kedua titik uji dengan\r\nnilai 4,55% pada titik BH-01 dan 9,29% pada BH-02. Dan hasil selisih terkecil pada\r\nmetode elemen hingga dengan hasil CAPWAP ada pada titik BH-01 yaitu 9,8%.\r\nDimana hasil selisih positif daya dukung CAPWAP uji di lapangan meningkat lebih\r\nbesar jika dibandingkan dengan perhitungan teori maka pengujian daya dukung di\r\nlapangan secara dinamis dapat dikatakan aman. Hasil selisih perbandingan terkecil\r\npenurunan adalah menggunakan metode Paulus&Davis terhadap hasil CAPWAP\r\npada BH-01 yaitu -13% dan BH-02 yaitu -23%. Hasil PDA Test pada tiang No.1\r\nterjadi overstressed karena nilai CSX lebih tinggi dari tegangan ijin tekan, untuk\r\nEMX tiang No.2 melebihi efisiensi hammer yang disarankan, pada laporan hasil\r\nCAPWAP tidak terdapat keterangan dari CAPWAP match quality dan terdapat data\r\nyang belum lengkap diberikan dalam laporan, seperti persentase kerusakan fondasi\r\n(BTA) dan tinggi jatuh hammer test (STK).\r\nKata Kunci: Bored Pile, Daya Dukung dan Penurunan, PDA (Pile Driving Analyzer) dan\r\nCAPWAP"^^ . "2021" . . . . . "FAKULTAS TEKNIK"^^ . . . . . . . "1715011002"^^ . "FRISKA HANDAYANI"^^ . "1715011002 FRISKA HANDAYANI"^^ . . . . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (File PDF)"^^ . . . "Friska Handayani_1715011002_Abstrak_ - Friska Handayani.pdf"^^ . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (File PDF)"^^ . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (File PDF)"^^ . . . "Friska Handayani_1715011002 SKRIPSI._Tanpa Bab Pembahasan dan Lampiran Isi_ - Friska Handayani.pdf"^^ . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (Other)"^^ . . . . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (Other)"^^ . . . . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (Other)"^^ . . . . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (Other)"^^ . . . . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (Other)"^^ . . . . . . "lightbox.jpg"^^ . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (Other)"^^ . . . . . . "preview.jpg"^^ . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (Other)"^^ . . . . . . "medium.jpg"^^ . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (Other)"^^ . . . . . . "small.jpg"^^ . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (Other)"^^ . . . . . . "lightbox.jpg"^^ . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (Other)"^^ . . . . . . "preview.jpg"^^ . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (Other)"^^ . . . . . . "medium.jpg"^^ . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (Other)"^^ . . . . . . "small.jpg"^^ . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (Other)"^^ . . . . . . "indexcodes.txt"^^ . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (Other)"^^ . . . . . . "ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN\r\nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS,\r\nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING\r\n\r\nANALYZER)\r\n\r\n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro) (Other)"^^ . . . . . . "indexcodes.txt"^^ . . "HTML Summary of #60780 \n\nANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN \nFONDASI BORED PILE MENGGUNAKAN METODE TEORITIS, \nMETODE ELEMEN HINGGA DENGAN UJI TEST PDA (PILE DRIVING \n \nANALYZER) \n \n(Studi Kasus Pembangunan Gedung B Rumah Sakit Muhammadiyah Metro)\n\n" . "text/html" . . . "620 Ilmu teknik dan ilmu yang berkaitan" . .