Digital Library: No conditions. Results ordered -Date Deposited. 2024-03-29T13:49:56ZEPrintshttp://digilib.unila.ac.id/images/sitelogo.pnghttp://digilib.unila.ac.id/2022-04-28T07:28:22Z2022-04-28T07:28:22Zhttp://digilib.unila.ac.id/id/eprint/60639This item is in the repository with the URL: http://digilib.unila.ac.id/id/eprint/606392022-04-28T07:28:22ZSTUDI PEMBEBANAN MAKSIMUM PADA SISTEM INTERKONEKSI
SUMSEL - LAMPUNG DENGAN MEMPERTIMBANGKAN
KARAKTERISTIK OPERASI RELE JARAK TIPE QUADRILATERALRele jarak merupakan pengaman utama dan pengaman cadangan pada
saluran transmisi. Rele jarak mengukur besarnya nilai impedansi dari perbandingan
antara besarnya tegangan dan arus. Saat nilai impedansi lebih kecil dari pada
impedansi setting maka rele akan bekerja. Tetapi, pada saat impedansi lebih besar
dari impedansi setting maka rele tidak akan bekerja. Besarnya nilai arus
dipengaruhi oleh kondisi pembebanan, dimana saat kondisi pembebanan tinggi
maka nilai arus akan semakin besar dan membuat nilai impedansi pada saluran kecil.
Penelitian ini mencoba untuk mengevaluasi pembebanan maksimum antara sistem
interkoneksi Sumatera Selatan dan Lampung terhadap setting rele jarak yang
sebenarnya. Sistem ini dilengkapi dengan rele jarak tipe quadrilateral. Evaluasi
didasarkan pada pemeriksaan grafis dengan memiliki plot lintasan pembebanan
subsistem Lampung pada diagram R-X. Untuk setiap kondisi operasi yaitu keadaan
awal atau saat terjadi kontingensi, pengali skalar diterapkan secara bertahap ke
beban Subsistem Lampung. Setiap kenaikan beban menghasilkan koordinat R-X
pada margin operasi rele jarak. Oleh karena itu, plot yang dihasilkan dari penelitian
ini dapat digunakan untuk memprediksi kemungkinan jarak kondisi arus
pembebanan ke margin operasional rele jarak tipe quadrilateral. Penelitian yang
diusulkan mampu melihat posisi impedansi semu pada diagram R-X untuk setiap
kondisi operasi dan juga mengetahui besarnya penambahan beban maksimum
berdasarkan karakteristik setting operasi rele jarak tipe quadrilateral.
Kata Kunci : Sistem Interkoneksi, Pembebanan Maksimum, Rele Jarak tipe
Quadrilateral.
The distance relay is the primary and backup safety in the transmission line.
The magnitude of the impedance value of the ratio between the magnitudes of
voltage and current is measured by the distance relay. The relay will operate when
the impedance value is less than the setting impedance. The relay, on the other hand,
will not work if the impedance is greater than the preset impedance. The magnitude
of the current value is determined by the loading conditions, with higher loading
conditions resulting in a higher current value and a lower impedance value in the
line. This research aims to determine the maximum load between South Sumatra
and Lampung's interconnection system based on actual distance relay settings. This
system is equipped with quadrilateral type of distance relay. The evaluation was
based on graphical inspection by having plots of Lampung subsystem loading
trajectory on the impedance chart. For each operating condition i.e. base case or
contingencies, a scalar multiplier was applied incrementally to loads of Lampung
Subsystem. Each load increment resulted in an R-X coordinate on the chart.
Therefore, plots resulted from this work can be used to predict possible distance of
current loading condition to the quadrilateral relay operational margins. The
proposed research can identify the amount of maximum load addition based on the
characteristics of the quadrilateral type distance relay operating setting and examine
the apparent impedance position on the R-X diagram for each operating condition.
Keywords: Interconnection System, Maximum Loadability, Quadrilateral Distance
Relay.1715031041 YOEL GUDMEAN GULTOMyoelgultom72@gmail.com