Ir. Hi. Sabirin Syukri, S.E, JUWANDI YASA (2013) OPERATIONAL CHARACTERISTIC OF BRT (BUS RAPID TRANSIT) IN TEUKU UMAR STREET BANDAR LAMPUNG AFTER ROAD WIDENING. Masters thesis, UNIVERSITAS LAMPUNG.
|
File PDF
Cover Dalam.pdf - Published Version Download (43Kb) | Preview |
|
|
File PDF
Abstrak.pdf - Published Version Download (124Kb) | Preview |
|
|
File PDF
Lembar Persetujuan.pdf - Published Version Download (56Kb) | Preview |
|
|
File PDF
Lembar Pengesahan.pdf - Published Version Download (67Kb) | Preview |
|
|
File PDF
Daftar Isi.pdf - Published Version Download (60Kb) | Preview |
|
|
File PDF
BAB I.pdf - Published Version Download (18Kb) | Preview |
|
|
File PDF
BAB II.pdf - Published Version Download (357Kb) | Preview |
|
|
File PDF
BAB III.pdf - Published Version Download (108Kb) | Preview |
|
File PDF
BAB IV.pdf - Published Version Restricted to Hanya pengguna terdaftar Download (532Kb) |
||
|
File PDF
BAB V.pdf - Published Version Download (10Kb) | Preview |
|
|
File PDF
Daftar Pustaka.pdf - Published Version Download (121Kb) | Preview |
Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)
Trans bus bandar lampung as urban mass transit plays an important role for the government of bandar lampung in addressing the problem of traffic congestion and heavy traffic at the rush hour. Trans bus existence bandar lampung also very helpful community of bandar lampung especially for students, college students, employees and the general public in carrying out activities of daily activities by providing transportation that can provide a sense of security, comfortable, economical as well as save time. Trans bus operations simulation lampung on jalan teuku umar performed with some of the first scenario is the implementation of special BRT corridor and the second with the imposition of special BRT corridor by eliminating microbus / public transportation. Furthermore also seen the advantages and disadvantages of implementing BRT in full or partially. From the analysis of the two scenarios above simulation, we got the result that the application scenarios specifically BRT corridor by eliminating microbus / public transportation increases the level of service to the tanjung karang - rajabasa from D to C and to route rajabasa - tanjung karang from E to D. Further analysis of the study is needed to determine the effectiveness of this scenario if applied in these other BRT routes in order to attract both local and non-local investors to invest in this mass transportation. Keywords: mass transit, scenario simulation, the level of service
Jenis Karya Akhir: | Tesis (Masters) |
---|---|
Subyek: | > Mesin (General). Mesin Sipil (General) > Mesin (General). Mesin Sipil (General) Mesin (General). Mesin Sipil (General) |
Program Studi: | Fakultas Teknik > Prodi Magister Teknik Sipil |
Pengguna Deposit: | Dr. Eng. Hasan Khairudin |
Date Deposited: | 21 Mar 2014 09:09 |
Terakhir diubah: | 21 Mar 2014 09:09 |
URI: | http://digilib.unila.ac.id/id/eprint/1312 |
Actions (login required)
Lihat Karya Akhir |