Rangga Aris Munandar, 1015041045 (2015) PRARANCANGAN PABRIK POTASSIUM KARBONAT DARI POTASSIUM HIDROKSIDA DAN GAS KARBONDIOKSIDA KAPASITAS 30.000 TON/TAHUN (Perancangan Reaktor (RE-201)). Fakultas Teknik, Universitas Lampung.
This is the latest version of this item.
|
Text
COVER LUAR.pdf Download (20kB) |
||
|
Text
ABSTRAK.pdf Download (9kB) |
||
|
Text
ABSTRACT.pdf Download (10kB) |
||
|
Text
COVER DALAM.pdf Download (21kB) |
||
|
Text
PERSETUJUAN.pdf Download (210kB) |
||
|
Text
PENGESAHAN.pdf Download (213kB) |
||
|
Text
PERNYATAAN.pdf Download (156kB) |
||
|
Text
RIWAYAT HIDUP.pdf Download (129kB) |
||
|
Text
MOTO.pdf Download (30kB) |
||
|
Text
PERSEMBAHAN.pdf Download (29kB) |
||
|
Text
SANWACANA.pdf Download (81kB) |
||
|
Text
DAFTAR ISI.pdf Download (14kB) |
||
|
Text
DAFTAR TABEL.pdf Download (98kB) |
||
|
Text
DAFTAR GAMBAR.pdf Download (13kB) |
||
|
Text
BAB I.pdf Restricted to Registered users only Download (411kB) | Request a copy |
||
|
Text
BAB II.pdf Restricted to Registered users only Download (549kB) | Request a copy |
||
|
Text
BAB III.pdf Restricted to Registered users only Download (126kB) | Request a copy |
||
|
Text
BAB IV.pdf Restricted to Registered users only Download (460kB) | Request a copy |
||
|
Text
BAB V.pdf Restricted to Registered users only Download (441kB) | Request a copy |
||
|
Text
BAB VI.pdf Restricted to Registered users only Download (679kB) | Request a copy |
||
|
Text
BAB VII.pdf Restricted to Registered users only Download (489kB) | Request a copy |
||
|
Text
BAB VIII.pdf Restricted to Registered users only Download (248kB) | Request a copy |
||
|
Text
BAB IX.pdf Restricted to Registered users only Download (347kB) | Request a copy |
||
|
Text
BAB X.pdf Restricted to Registered users only Download (7kB) | Request a copy |
||
|
Text
DAFTAR PUSTAKA.pdf Download (230kB) | Preview |
Abstract
ABSTRAK Pabrik potassium karbonat (K2CO3) ini berbahan baku potassium hidroksida (KOH) dan gas karbondioksida (CO2), yang rencanaya akan didirikan di Desa Sumuradem Kecamatan Sukra, Kabupaten Indramayu, Jawa Barat. Pabrik ini berdiri dengan mempertimbangkan ketersediaan bahan baku, sarana transportasi yang memadai, tenaga kerja, perizinan dan kondisi sosial masyarakat sekitar. Pabrik ini direncanakan dapat memproduksi butiran potassium karbonat (K2CO3) sebanyak 30.000 ton/tahun, dengan waktu operasi selama 24 jam/hari serta 330 hari/tahun. Banyaknya bahan baku yang digunakan adalah potassium hidroksida sebanyak 3.089,407 kg/jam dan gas karbondioksida sebanyak 3.761,874 kg/jam. Penyediaan kebutuhan utilitas pabrik potassium karbonat ini berupa unit penyedia dan pengolahan air, unit penyedia steam, unit penyedia udara instrumen dan unit penyedia gas karbondioksida. Jumlah karyawan sebanyak 171 orang dengan bentuk perusahaan adalah Perseroan Terbatas (PT) dengan struktur organisasi jenis line dan staff. Dari analisis ekonomi, maka diperoleh hasil sebagai berikut : Fixed Capital Investment (FCI) = Rp. 159.096.938.915,- Working Capital Investment (WCI) = Rp. 28.075.930.396,- Total Capital Investment (TCI) = Rp. 187.172.869.312 ,- Break Even Point (BEP) = 50,5% Shut Down Point (SDP) = 22% Pay Out Time after Taxes (POT)a = 2,81 tahun Return on Investment after Taxes (ROI)a = 21,77% Interest Rate Return (IRR) = 20% Annual Net Profit (Pa) = Rp. 25.198.825.619,-/tahun Berdasarkan beberapa paparan di atas, maka pendirian pabrik potassium karbonat ini layak untuk dikaji lebih lanjut, karena merupakan pabrik yang menguntungkan dari sisi ekonomi dan mempunyai prospek yang relatif cukup baik. ABSTRACT Potassium carbonate plant produced by reacting potassium hydroxide and carbondioxide, is planned to be located in Sumuradem village, Indramayu, West Java Province. The plant is established by considering availability of raw materials, transportation facilities, readily available labor and environmental conditions. This Plant is planned to production potassium carbonat powder with production capacity is 30.000 tons/year, with operating time of 24 hours/day and 330 working days in a year. The raw materials used in this plant are much 3.089,407 kg/hours of Potassium Hydroxide and Carbondioxide gas as 3.761,874 kg/hr. Provision of utility plant needs a treatment system and water supply, steam supply systems, instrument air supply systems, and carbondioxide gas supply system. Labor needed in this plant as many as 171 people with a business entity form Limited Liability Company (PT) with line and staff organizational structure. From the economic analysis is obtained : Fixed Capital Investment (FCI) = Rp. 159.096.938.915,- Working Capital Investment (WCI)= Rp. 28.075.930.396,- Total Capital Investment (TCI) = Rp. 187.172.869.312 ,- Break Even Point (BEP) = 50,5% Shut Down Point (SDP) = 22% Pay Out Time after Taxes (POT)a = 2,81 tahun Return on Investment after Taxes (ROI)a = 21,77% Interest Rate Return (IRR) = 20% Annual Net Profit (Pa) = Rp. 25.198.825.619,-/tahun By considering above the summary, it is proper establishment of potassium carbonate plant for studied further, because the plant is profitable and has good prospects future.
| Item Type: | Other |
|---|---|
| Subjects: | Q Science (General) > QD Chemistry Teknologi (General) Teknologi > Teknologi (General) Teknologi > Teknologi (General) |
| Divisions: | Fakultas Teknik > Prodi Teknik Kimia |
| Depositing User: | 8128801 . Digilib |
| Date Deposited: | 29 Dec 2015 07:34 |
| Last Modified: | 29 Dec 2015 07:34 |
| URI: | http://digilib.unila.ac.id/id/eprint/16365 |
Available Versions of this Item
- PRARANCANGAN PABRIK POTASSIUM KARBONAT DARI POTASSIUM HIDROKSIDA DAN GAS KARBONDIOKSIDA KAPASITAS 30.000 TON/TAHUN (Perancangan Reaktor (RE-201)). (deposited 29 Dec 2015 07:34) [Currently Displayed]
Actions (login required)
![]() |
View Item |
