BACK-FLASHOVER ANALYSIS USING CONSTANT-PARAMETER DISTRIBUTED LINE (CPDL) TOWER MODEL OF 150 kV TRANSMISSION LINE (Bukit Kemuning Substation–Batu Raja Substation)

0415031025, Afriando Wirahadi (2012) BACK-FLASHOVER ANALYSIS USING CONSTANT-PARAMETER DISTRIBUTED LINE (CPDL) TOWER MODEL OF 150 kV TRANSMISSION LINE (Bukit Kemuning Substation–Batu Raja Substation). Digital Library.

[img]
Preview
File PDF
ABSTRAK.pdf

Download (136Kb) | Preview
[img]
Preview
File PDF
COVER DALAM.pdf

Download (209Kb) | Preview
[img]
Preview
File PDF
COVER DEPAN.pdf

Download (368Kb) | Preview
[img]
Preview
File PDF
DAFTAR GAMBAR.pdf

Download (72Kb) | Preview
[img]
Preview
File PDF
DAFTAR ISI.pdf

Download (76Kb) | Preview
[img]
Preview
File PDF
daftar pustaka.pdf

Download (137Kb) | Preview
[img]
Preview
File PDF
I.pdf

Download (232Kb) | Preview
[img]
Preview
File PDF
II.pdf

Download (822Kb) | Preview
[img]
Preview
File PDF
III.pdf

Download (297Kb) | Preview
[img]
Preview
File PDF
IV.pdf

Download (1076Kb) | Preview
[img]
Preview
File PDF
Riwayat Hidup.pdf

Download (79Kb) | Preview
[img]
Preview
File PDF
PERSEMBAHAN.pdf

Download (92Kb) | Preview
[img]
Preview
File PDF
Sanwacana.pdf

Download (126Kb) | Preview
[img]
Preview
File PDF
V.pdf

Download (7Kb) | Preview

Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)

Back-flashover phenomenon is disturbances on the overhead transmission lin which caused by direct stroke on the ground wire and towers. Back-flashover w be occures in which voltage higher or same with the Insulator Critical Flashov the flashover happens on that insulator. It is very difficult to back-flashover analisys which direct measuring methode, th is reason to analyze with simulation by modelling the parameters on t transmission lines such as, tower model, insulator model, grond wire, phase w and grounding system based on IEEE Working Group model. In this research t parameters model that simulated by using EMTP/ATP Software 2005 version a using using tower model which recommended in Japan for lighting surge analys it is using Constant-Parameter Distributed Line (CPDL) tower model Minimum lightning current that can cause back-flashover using front time and t time of the IEEE standard 1,2 x 50 μs on phase A of 20 kA, phase B of 46 kA a phase C of 116 kA. While using front time and tail time of the CIGRE standa 3 x 77,5 μs on phase A of 18 kA, phase B of 45 kA and phase C of 97 kA. Bas on the calculation results of the simulation the number of strokes that can cau back-flashover on phase A of 5.98 strokes per 191.788 km/year, phase B strok per 191.788 2.058 km/year, and phase C of 0.33 strokes per 191.788 km/year. Keyword : back-flashover, Lighting, EMTP/ATP

Jenis Karya Akhir: Artikel
Subyek:
Program Studi: FKIP > Prodi Pendidikan Jasmani, Kesehatan dan Rekreasi
Pengguna Deposit: IC-STAR . 2015
Date Deposited: 26 Jan 2016 04:20
Terakhir diubah: 26 Jan 2016 04:20
URI: http://digilib.unila.ac.id/id/eprint/20187

Actions (login required)

Lihat Karya Akhir Lihat Karya Akhir