PRARANCANGAN PABRIK DEKSTRIN DARI UBI KAYU KAPASITAS 35.000 TON/TAHUN (Perancangan Reaktor Liquifaksi (RE-202))

PIRDA HILINE NOVRIYANTORO, 1115041017 (2017) PRARANCANGAN PABRIK DEKSTRIN DARI UBI KAYU KAPASITAS 35.000 TON/TAHUN (Perancangan Reaktor Liquifaksi (RE-202)). Fakultas Teknik, UNIVERSITAS LAMPUNG.

[img]
Preview
FIle PDF
ABSTRACT (ABSTRAK).pdf

Download (11Kb) | Preview
[img] FIle PDF
SKRIPSI FULL.pdf
Restricted to Hanya pengguna terdaftar

Download (2292Kb)
[img]
Preview
FIle PDF
SKRIPSI TANPA PEMBAHASAN.pdf

Download (2292Kb) | Preview

Abstrak

Pabrik dekstrin berbahan baku ubi kayu, akan didirikan di Gunung Batin, Lampung Tengah, Lampung. Pabrik ini berdiri dengan mempertimbangkan ketersediaan bahan baku, sarana transportasi yang memadai, tenaga kerja yang mudah didapatkan dan kondisi lingkungan. Pabrik direncanakan memproduksi dekstrin sebanyak 35.000 ton/tahun, dengan waktu operasi 24 jam/hari, 330 hari/tahun. Bahan baku yang digunakan adalah ubi kayu sebanyak 5.391,25 kg/jam. Jumlah karyawan sebanyak 186 orang dengan bentuk perusahaan adalah Perseroan Terbatas (PT) menggunakan struktur organisasi line dan staff. Dari analisis ekonomi diperoleh: Fixed Capital Investment (FCI) = Rp. 363.145.304.458,- Working Capital Investment (WCI) = Rp. 64.084.465.493,- Total Capital Investment (TCI) = Rp. 427.229.769.951,- Break Even Point (BEP) = 42,56% Shut Down Point (SDP) = 22,49% Pay Out Time after Taxes (POT)a = 2,60 tahun Return on Investment after Taxes (ROI)a = 24,19% Internal Rate Return (IRR) = 30,99% Mempertimbangkan paparan di atas, sudah selayaknya pendirian pabrik dekstrin ini dikaji lebih lanjut, karena merupakan pabrik yang menguntungkan dan mempunyai masa depan yang baik. ABSTRACT A plant to produce dextrins from cassava is planned to be located at Gunung Batin, Central Lampung, Lampung. The plant is established by considering availability of raw materials, transportation facilities, readily available labor and environmental conditions. Capacity of the plant is 35.000 tons/year operating 24 hour/day and 330 working days/ year. The plant required 5.391,25 kg/hr cassava. Quantity of labor is around 186 people. The plant is managed as a Limited Liability Company (PT), which is headed by a Director who is assisted by a Director of Production and Director of Finance. The company is organized in the form of line and staff structure. From analysis of the plant economy is obtained: Fixed Capital Investment (FCI) = Rp. 363.145.304.458,- Working Capital Investment (WCI) = Rp. 64.084.465.493,- Total Capital Investment (TCI) = Rp. 427.229.769.951,- Break Even Point (BEP) = 42,56% Shut Down Point (SDP) = 22,49% Pay Out Time after Taxes (POT)a = 2,60 years Return on Investment after Taxes (ROI)a = 24,19% Internal Rate Return (IRR) = 30,99% By considering above the summary, it is suitable study further the dextrins plant since plant is profitable and has good prospects.

Jenis Karya Akhir: Skripsi
Subyek: > QD Chemistry
> Memproduksi
> Memproduksi
Program Studi: Fakultas Teknik > Prodi S1-Teknik Kimia
Pengguna Deposit: 74042679 . Digilib
Date Deposited: 22 Nov 2017 02:30
Terakhir diubah: 22 Nov 2017 02:30
URI: http://digilib.unila.ac.id/id/eprint/29080

Actions (login required)

Lihat Karya Akhir Lihat Karya Akhir