PRARANCANGAN PABRIK ALUMUNIUM SULFAT DARI BAUKSIT DAN ASAM SULFAT KAPASITAS 50.000 TON/TAHUN

satwika kinkin darajatun, 0715041067 (2014) PRARANCANGAN PABRIK ALUMUNIUM SULFAT DARI BAUKSIT DAN ASAM SULFAT KAPASITAS 50.000 TON/TAHUN. FAKULTAS TEKNIK, UNIVERSITAS LAMPUNG.

[img]
Preview
File PDF
COVER DALAM.pdf

Download (33Kb) | Preview
[img] File PDF
ABSTRAK.pdf

Download (133Kb)
[img] File PDF
ABSTRACT.pdf

Download (140Kb)
[img]
Preview
File PDF
LEMBAR PERSETUJUAN.pdf

Download (390Kb) | Preview
[img]
Preview
File PDF
lembar pengesahan.pdf

Download (302Kb) | Preview
[img]
Preview
File PDF
LEMBAR PERNYATAAN.pdf

Download (283Kb) | Preview
[img]
Preview
File PDF
RIWAYAT HIDUP.pdf

Download (94Kb) | Preview
[img]
Preview
File PDF
PERSEMBAHAN.pdf

Download (36Kb) | Preview
[img]
Preview
File PDF
MOTTO.pdf

Download (70Kb) | Preview
[img]
Preview
File PDF
SANWACANA.pdf

Download (93Kb) | Preview
[img]
Preview
File PDF
DAFTAR ISI.pdf

Download (127Kb) | Preview
[img]
Preview
File PDF
DAFTAR TABEL.pdf

Download (128Kb) | Preview
[img]
Preview
File PDF
DAFTAR GAMBAR.pdf

Download (120Kb) | Preview
[img]
Preview
File PDF
BAB 1.pdf

Download (183Kb) | Preview
[img]
Preview
File PDF
BAB 2.pdf

Download (3724Kb) | Preview
[img]
Preview
File PDF
BAB 3.pdf

Download (124Kb) | Preview
[img] File PDF
BAB 4.pdf
Restricted to Hanya pengguna terdaftar

Download (183Kb)
[img] File PDF
BAB 5.pdf
Restricted to Hanya pengguna terdaftar

Download (242Kb)
[img] File PDF
BAB 6.pdf
Restricted to Hanya pengguna terdaftar

Download (431Kb)
[img] File PDF
BAB 7.pdf
Restricted to Hanya pengguna terdaftar

Download (531Kb)
[img] File PDF
BAB 8.pdf
Restricted to Hanya pengguna terdaftar

Download (247Kb)
[img] File PDF
BAB 9.pdf
Restricted to Hanya pengguna terdaftar

Download (305Kb)
[img] File PDF
BAB 10.pdf
Restricted to Hanya pengguna terdaftar

Download (128Kb)
[img]
Preview
File PDF
DAFTAR PUSTAKA.pdf

Download (142Kb) | Preview

Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)

Pabrik aluminium sulfat berbahan baku asam sulfat, bauksit dan bijih besi akan didirikan di provinsi Riau. Pabrik ini berdiri dengan mempertimbangkan ketersediaan bahan baku, sarana transportasi yang memadai, tenaga kerja yang mudah didapatkan dan kondisi lingkungan. Pabrik direncanakan memproduksi aluminium sulfat sebanyak 50.000 ton/tahun, dengan waktu operasi 24 jam/hari, 330 hari/tahun. Bahan baku yang digunakan adalah asam sulfat sebanyak 6.140,503 kg/jam, bauksit sebanyak 4.221,773 kg/jam dan serbuk besi sebanyak 174,071 kg/jam. Bentuk perusahaan adalah Perseroan Terbatas (PT) menggunakan struktur organisasi line dan staff dengan jumlah karyawan sebanyak 152 orang. Dari analisis ekonomi diperoleh: Fixed Capital Investment (FCI) = Rp 394.562.843.995, - Working Capital Investment (WCI) = Rp 40.002.928.191,- Total Capital Investment (TCI) = Rp 434.565.772.186,- Break Even Point (BEP) = 52,77 % Pay Out Time before Taxes (POT)b = 2,2042 tahun Pay Out Time after Taxes (POT)a = 2,6113 tahun Return on Investment before Taxes (ROI)b = 30,06 % Return on Investment after Taxes (ROI)a = 24,05 % Discounted Cash Flow (DCF) = 18 % Mempertimbangkan paparan di atas, sudah selayaknya pendirian pabrik Alumunium sulfat ini dikaji lebih lanjut, karena merupakan pabrik yang menguntungkan dan mempunyai masa depan yang baik. Aluminium sulfate plant produced by reacting bauxite and sulfate acid was plan to be in industrial plant in Riau Province. Plant was established by considering the availability of raw materials, transportation facilities, readily available labor and environmental conditions. Plant's production capacity is planned 50,000 tons / year, with operating time of 24 hours / day and 330 working days in a year. The raw materials used are much sulfate acid as 6.140,503 kg / hr, bauxite as 4.221,773 kg / hr, and iron powder as 174,071 kg/hr. Provision of utility plant needs a treatment system and water supply, steam supply systems, instrument air supply systems, and power generation systems. Labor needed as many as 125 people with a business entity form Limited Liability Company (PT) which is headed by a Director who is assisted by the Director of Production and Director of Finance with line and staff organizational structure. From the economic analysis is obtained: Fixed Capital Investment (FCI) = Rp 394.562.843.995, - Working Capital Investment (WCI) = Rp 40.002.928.191,- Total Capital Investment (TCI) = Rp 434.565.772.186,- Break Even Point (BEP) = 52,77 % Pay Out Time before Taxes (POT)b = 2,2042 tahun Pay Out Time after Taxes (POT)a = 2,6113 tahun Return on Investment before Taxes (ROI)b = 30,06 % Return on Investment after Taxes (ROI)a = 24,05 % Discounted Cash Flow (DCF) = 18 % Consider the summary above, it is proper establishment of Aluminium Sulfate plant to studied further, because the plant is profitable and has good prospects.

Jenis Karya Akhir: Skripsi
Subyek:
Program Studi: Fakultas Teknik > Prodi S1-Teknik Kimia
Pengguna Deposit: satwika .kinkin darajatun
Date Deposited: 22 Aug 2014 04:17
Terakhir diubah: 22 Aug 2014 04:17
URI: http://digilib.unila.ac.id/id/eprint/2938

Actions (login required)

Lihat Karya Akhir Lihat Karya Akhir