Ignasius Pradipta Angga Prayoga, 1115011039 (2018) PEMELIHARAAN JALAN LINTAS PANTAI TIMUR PROPINSI LAMPUNG STUDI KASUS RUAS 004 (Bts. Kab. Lampung Tengah/Kab. Tl. Bawang – Bts. Kab.Lampung Tengah/Kab. Lampung Timur Dengan Metode Lendutan Mengunakan Alat Fwd). UNIVERSITAS LAMPUNG, FAKULTAS TEKNIK.
File PDF
ABSTRAK.pdf Download (24Kb) |
|
File PDF
SKRIPSI FULL.pdf Restricted to Hanya pengguna terdaftar Download (1486Kb) |
|
File PDF
SKRIPSI TANPA BAB PEMBAHASAN.pdf Download (1002Kb) |
Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)
Penelitian ini di laksanakan untuk menghitung tebal pelapisan ulang serta menghitung kebutuhan biaya perbaikan Jalan Lintas Pantai Timur Provinsi Lampung Ruas 004 (Bts. Kab. Lampung Tengah/Kab. Tl. Bawang – Bts. Kab. Lampung Tengah/Kab. Lampung Timur) pada tahun 2018 dengan umur rencana 20 tahun ke depan. Dari hasil analisa Jalan Lintas Pantai Timur Provinsi Lampung Ruas 004 (Bts. Kab. Lampung Tengah/Kab. Tl. Bawang – Bts. Kab. Lampung Tengah/Kab. Lampung Timur) menunjukan bahwa dibutuhkan peningkatan kualitas jalan karena terjadi penurunan kualitas jalan dan peningkatan pertumbuhan lalu-lintas. Hasil analisa agar dapat melayani lalu-lintas sebanyak 45.397.801 ESA maka diperlukan peningkatan kualitas jalan dengan melakukan pelapisan tambah (overlay,) pada jalan tersebut sebesar 17 cm lapis tambah dengan Laston agar mampu melayani beban lalu-lintas di jalan tersebut 20 tahun ke depan. Kata Kunci : pemeliharaan, overlay, lalu-lintas abstract This research was carried out to calculate the thickness of resurfacing and calculate the cost of repairing the East Coast Crossing Road of Street Lampung 004 Province ( Lampung Tengah / Tulang Bawang Regency- Lampung Tengah / East Lampung Regency) in 2018 with the age of the next 20 years plan. From the results of the analysis of the East Coast Crossing of Lampung Province, Section 004 (the limit of Lampung Tengah District / Tl. Bawang – the limit of Lampung Tengah Regency/ Lampung Timur Regency) shows that road quality improvement is needed due to road quality degradation and increased traffic growth. The results of the analysis in order to be able to serve traffic as much as 45,397,801 ESA, it is necessary to improve the quality of the road by overlaying the road by 17 cm in layers plus Laston in order to be able to service the traffic load on the road 20 years ahead. Keywords: maintenance, overlay, traffic
Jenis Karya Akhir: | Skripsi |
---|---|
Subyek: | > Rekayasa jalan raya . Jalan dan trotoar > Rekayasa jalan raya . Jalan dan trotoar |
Program Studi: | Fakultas Teknik > Prodi S1-Teknik Sipil |
Pengguna Deposit: | 188477469 . Digilib |
Date Deposited: | 18 Oct 2018 08:19 |
Terakhir diubah: | 18 Oct 2018 08:19 |
URI: | http://digilib.unila.ac.id/id/eprint/33821 |
Actions (login required)
Lihat Karya Akhir |