PRARANCANGAN PABRIK BUTYLENE OXIDE DARI 2-BUTENE DAN OKSIGEN DENGAN KATALIS VANADIUM NAPHTHENATE OXIDE KAPASITAS 32.000 TON/TAHUN (Tugas Khusus Perancangan Reaktor Gelembung 201 (RE-201))

TIKA NOVARANI, 1115041046 (2019) PRARANCANGAN PABRIK BUTYLENE OXIDE DARI 2-BUTENE DAN OKSIGEN DENGAN KATALIS VANADIUM NAPHTHENATE OXIDE KAPASITAS 32.000 TON/TAHUN (Tugas Khusus Perancangan Reaktor Gelembung 201 (RE-201)). FAKULTAS TEKNIK, UNIVERSITAS LAMPUNG.

[img]
Preview
File PDF
1. ABSTRAK.pdf

Download (74Kb) | Preview
[img] File PDF
2. SKRIPSI FULL.pdf
Restricted to Hanya staf

Download (4004Kb)
[img]
Preview
File PDF
3. SKRIPSI TANPA PEMBAHASAN.pdf

Download (1848Kb) | Preview

Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)

Butylene Oxide merupakan salah satu produk industri kimia yang digunakan sebagai bahan baku pembuatan poliol poliester dan polieter, pelarut methyl chloroform pada metal cleaning, sebagai bahan baku butylene glycol dan comonomer dalam pembuatan nonionic surfactant. Butylene Oxide dapat di produksi dengan beberapa proses yaitu 1) Proses Hidrogenasi Vinyloxirane, 2) Proses Oksidasi 2-butene, dan 3) Proses Klorohidrinasi butene dan dehidroklorinasi butylene chlorohidrin. Penyediaan kebutuhan utilitas pabrik berupa sistem pengolahan dan penyediaan air, sistem penyediaan steam, cooling water, sistem penyediaan udara tekan,dan sistem pembangkit tenaga listrik. Kapasitas produksi pabrik direncanakan 32.000 ton/tahun dengan 330 hari kerja dalam 1 tahun. Lokasi pabrik direncanakan didirikan di daerah Cilegon, Banten. Tenaga kerja yang dibutuhkan sebanyak 141 orang dengan bentuk badan usaha Perseroan Terbatas (PT) yang dipimpin oleh seorang Direktur Utama yang dibantu oleh Direktur Produksi dan Direktur Keuangan dengan struktur organisasi line and staff. Dari analisis ekonomi diperoleh: Fixed Capital Investment (FCI) = Rp 395.563.009.491 Working Capital Investment (WCI) = Rp 69.805.236.969 Total Capital Investment (TCI) = Rp 465.368.246.460 Break Even Point (BEP) = 41,83% Shut Down Point (SDP) = 27,80% Pay Out Time after taxes (POT)a = 1,49 tahun Return on Investment after taxes (ROI)a = 46,30% Mempertimbangkan rangkuman di atas, sudah selayaknya pendirian pabrik Butylene Oxide ini dikaji lebih lanjut, karena merupakan pabrik yang menguntungkan dan mempunyai prospek yang baik. Butylene Oxide is one of the chemical industry products used as raw material for the manufacture of polyester and polyether polyols, methyl chloroform solvents in metal cleaning, as raw material for butylene glycol and comonomers in the manufacture of nonionic surfactants. Butylene Oxide can be produced with several processes, namely 1) Process of 2-Butene Oxidation, 2) Hydrogenation Process of Vinyloxirane, and 3) Process of Dehydrochlorination of Butylene chlorohydrin and Chlorohidrination of Butene. Provision of utility plant needs in the form of water treatment and supply systems, steam supply systems, cooling water, compressed air supply systems, and power generation systems. The factory production capacity is planned for 32,000 tons/year with 330 working days in 1 year. The factory location is planned to be established in the Cilegon area, Banten. The workforce needed is 141 people with a form of business entity Limited Liability Company (PT) led by a Managing Director who is assisted by Director of Production and Technical, Commersial, Human Resources and General Affairs with line and staff organizational structures. By the economic analysis, pre design of this plant investment is obtained: Fixed Capital Investment (FCI) = Rp. 395.563.009.491 Working Capital Investment (WCI) = Rp. 69.805.236.969 Total Capital Investment (TCI) = Rp. 465.368.246.460 Break Even Point (BEP) = 41,83 % Shut Down Point (SDP) = 27,80 % Return on Investment after taxes (ROI)a = 46,30 % Pay Out Time after taxes (POT)a = 1,49 years Considering the summary above, it is appropriate to establish a Butylene Oxide plant to be studied further, because it is a profitable factory and has good prospects.

Jenis Karya Akhir: Skripsi
Subyek: 600 Teknologi (ilmu terapan) > 620 Ilmu teknik dan ilmu yang berkaitan
Program Studi: Fakultas Teknik > Prodi S1-Teknik Kimia
Pengguna Deposit: UPT . Teti Novianti
Date Deposited: 31 Mar 2022 10:28
Terakhir diubah: 31 Mar 2022 10:28
URI: http://digilib.unila.ac.id/id/eprint/56990

Actions (login required)

Lihat Karya Akhir Lihat Karya Akhir