PENERAPAN BUILDING INFORMATION MODELING (BIM) MENGGUNAKAN SOFTWARE AUTODESK REVIT 2019 PADA PEKERJAAN STRUKTUR (Studi Kasus: Gedung G Fakultas Pertanian Universitas Lampung)

FASYA NOOR LAILY, 1615011029 (2021) PENERAPAN BUILDING INFORMATION MODELING (BIM) MENGGUNAKAN SOFTWARE AUTODESK REVIT 2019 PADA PEKERJAAN STRUKTUR (Studi Kasus: Gedung G Fakultas Pertanian Universitas Lampung). FAKULTAS TEKNIK, UNIVERSITAS LAMPUNG.

[img]
Preview
FIle PDF
ABSTRAK - FASYA NOOR LAILY (1615011029) - Fasya Laily.pdf

Download (284Kb) | Preview
[img] FIle PDF
SKRIPSI FULL - FASYA NOOR LAILY (1615011029) - Fasya Laily.pdf
Restricted to Hanya staf

Download (8Mb)
[img]
Preview
FIle PDF
SKRIPSI TANPA PEMBAHASAN - FASYA NOOR LAILY (1615011029) - Fasya Laily.pdf

Download (5Mb) | Preview

Abstrak

Dengan semakin berkembangnya teknologi di bidang konstruksi, perencanaan pembangunan yang mencakup seluruh data dan informasi dapat dengan mudahnya direpresentasikan dalam bentuk model 3D. Proses perencanaan terintegrasi tersebut disebut sebagai Building Information Modeling (BIM). Penelitian ini dilakukan untuk mengeksplorasi potensi BIM dengan menggunakan Revit 2019 dalam memodelkan elemen struktur, meninjau hasil pemodelan yang telah dibuat, dan mengetahui perbandingan perhitungan BoQ. Hasil dari penelitian ini dapat digunakan sebagai tambahan acuan dan pertimbangan dalam merencanakan suatu pekerjaan konstruksi berbasis BIM. Penelitian ini menggunakan Gedung G Fakultas Pertanian Universitas Lampung sebagai studi kasus penelitian dan Revit 2019 sebagai platform BIM. Hasil dari penelitian yang telah dilakukan menunjukkan bahwa dibutuhkan spesifikasi hardware yang tinggi untuk menjalankan Revit 2019; Revit 2019 menampilkan user interface yang mudah dipahami; pemodelan elemen struktur Gedung G Fakultas Pertanian Unila berbasis BIM dengan Revit 2019 dapat dilakukan dengan baik; proses pemodelan dan revisi desain dapat dilakukan dengan mudah, efektif, dan efisien; kemungkinan terjadinya kesalahan akibat human error dalam proses mendesain dan menghitung volume kuantitas dapat diminimalisasikan; adanya fitur pendeteksi clash antar elemen menjadikan Revit 2019 sebagai suatu alternatif software BIM yang tepat digunakan untuk meminimalisasi kesalahan desain sebelum pekerjaan konstruksi dimulai; perhitungan volume kuantitas dengan Revit 2019 dapat dilakukan dengan cepat. Kata kunci: BIM, BoQ, Metode Konvensional, Revit 2019. As the technology in the construction sector develops, designing process that include all data and information can be easily represented in the form of 3D models. The integrated designing process is known as Building Information Modeling (BIM). This study aims to explore the potential of BIM by using Revit 2019 in modeling structural elements, to review the results of the modeling that has been made, and to find out the comparison of BoQ calculations. The results of this study can be used as an additional reference and consideration in designing a BIM-based construction work. This study uses Building G, Faculty of Agriculture, University of Lampung as the case study and Revit 2019 as the BIM platform. The results of this study show that high hardware specifications are needed to run Revit 2019; Revit 2019 displays an easy-to-understand user interface; modeling the structural elements of Building G, Faculty of Agriculture, University of Lampung, using Revit 2019 can be done well; the process of modeling and revising design can be done easily, effectively, and efficiently; the possibility of errors due to human error in the process of designing and calculating the quantity volume can be minimized; the clash detection feature between elements in Revit 2019 can be used to minimize errors before the construction work begins; quantity volume calculations with Revit 2019 can be done quickly. Key words: BIM, BoQ, Conventional Method, Revit 2019.

Jenis Karya Akhir: Skripsi
Subyek: 000 Ilmu komputer, informasi dan pekerjaan umum
600 Teknologi (ilmu terapan) > 620 Ilmu teknik dan ilmu yang berkaitan
Program Studi: Fakultas Teknik > Prodi S1-Teknik Sipil
Pengguna Deposit: UPT . Neti Yuliawati
Date Deposited: 18 May 2022 02:56
Terakhir diubah: 18 May 2022 02:56
URI: http://digilib.unila.ac.id/id/eprint/61207

Actions (login required)

Lihat Karya Akhir Lihat Karya Akhir