ANDRIAN PUTRA AULIA, 1415011017 (2021) PERBAIKAN TANAH DASAR DENGAN METODE PRELOADING DAN PREFABRICATED VERTICAL DRAIN (PVD). Fakultas Teknik, UNIVERSITAS LAMPUNG.
|
File PDF
ABSTRAK - andrian putra Aulia.pdf Download (10Kb) | Preview |
|
File PDF
SKRIPSI FULL - andrian putra Aulia.pdf Restricted to Hanya staf Download (2012Kb) |
||
|
File PDF
SKRIPSI TANPA BAB PEMBAHASAN - andrian putra Aulia.pdf Download (951Kb) | Preview |
Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)
Tanah lempung mempunyai sifat kurang baik secara teknis untuk mendukung suatu pekerjaan kontruksi. Tanah tersebut mengalami penurunan yang besar dan dalam waktu yang sangat lama. Hal inilah yang sering menjadi masalah dalam pelaksanaan suatu pekerjaan kontruksi. Pada studi kasus tanah timbunan di proyek tol sumatera ruas Terbanggi - Kayu Agung ini, perbaikan tanah lempung untuk mengatasi masalah diatas adalah dengan cara menggunakan kombinasi antara Preloading dan Prefabricated Vertical Drain (PVD). Pemasangan PVD dapat mempercepat waktu penurunan yang terjadi karena disipasi air pori terjadi dalam arah vertical. Dalam tugas akhir ini, dilakukan analisa perhitungan konsolidasi tanah dengan menggunakan metode elemen hingga. Analisa jarak spasi antar PVD untuk mendapatkan jarak yang paling efektif yang disesuaikan dengan waktu konsolidasi yang paling cepat,jarak spasi antar PVD yang diperhitungkan ialah 1 m; 1,5 m dan 2 m. Dari hasil perhitungan tanpa menggunakan PVD diperoleh waktu 25000 hari dan mengalami penurunan sebesar 0,905 m. Sedangkan dengan jarak spasi PVD 1 m menghasilkan waktu konsolidasi 163 hari dan mengalami penurunan 0,868 m, jarak spasi antar PVD 1,5 m menghasilkan waktu konsolidasi 163 hari dan mengalami penurunan 0,868 m , dan jarak spasi 2 m mengasilkan waktu konsolidasi selama 163 hari dengan penurunan 0,882 m. Dari analisa yang telah dilakukan dapat disimpulkan bahwa jarak pemasangan yang paling efektif adalah menggunakan kombinasi preloading dan PVD dengan jarak PVD 1,5 m. . Kata kunci : Preloading, Prefabricated Vertical Drain (PVD), Konsolidasi Clay soil has technically unfavorable properties to support a construction work. The land experienced a great decline and in a very long time. This is often a problem in the implementation of a construction work. In this case study of embankment soil in the Terbanggi - Kayu Agung toll road project, the improvement of clay soil to overcome the above problem is by using a combination of Preloading and Prefabricated Vertical Drain (PVD). Installation of PVD can speed up the settlement time that occurs because the pore water dissipation occurs in the vertical direction. In this final project, analysis of soil consolidation calculations is carried out using the finite element method. Analysis of the spacing between PVDs to get the most effective distance adjusted for the fastest consolidation time, the calculated spacing between PVDs is 1 m; 1.5 m and 2 m. From the results of calculations without using PVD that has been carried out, it is obtained that the time reaches 25000 days and has decreased by 0.905 m. Meanwhile, using 1 m PVD spacing resulted in a consolidation time of 163 days and decreased by 0.868 m, 1.5 m spacing between PVDs resulted in a consolidation time of 163 days and decreased by 0.868 m, and a 2 m spacing resulted in a consolidation time of 1 m. 163 days and decreased by 0.882 m. From the analysis that has been done, it can be concluded that the most effective installation distance is to use a combination of preloading and PVD with a PVD distance of 1.5 m. Keywords : Preloading, Prefabricated Vertical Drain (PVD), Consolidation
Jenis Karya Akhir: | Skripsi |
---|---|
Subyek: | 600 Teknologi (ilmu terapan) 600 Teknologi (ilmu terapan) > 620 Ilmu teknik dan ilmu yang berkaitan |
Program Studi: | Fakultas Teknik > Prodi S1-Teknik Sipil |
Pengguna Deposit: | UPT . Dito Nipati |
Date Deposited: | 06 Jun 2022 04:42 |
Terakhir diubah: | 06 Jun 2022 04:42 |
URI: | http://digilib.unila.ac.id/id/eprint/62617 |
Actions (login required)
Lihat Karya Akhir |