PENERAPAN RENDAL HAR (PERENCANAAN DAN PENGENDALIAN PEMELIHARAAN) PADA UNIT LOGISTIK DI PT. PLN (PERSERO) UPDK BANDAR LAMPUNG

ASYIFA MADYA, ANGGITA (2023) PENERAPAN RENDAL HAR (PERENCANAAN DAN PENGENDALIAN PEMELIHARAAN) PADA UNIT LOGISTIK DI PT. PLN (PERSERO) UPDK BANDAR LAMPUNG. [Diploma/Tugas Akhir]

[img]
Preview
File PDF
ABSTRAK.pdf

Download (11Kb) | Preview
[img] File PDF
SKRIPSI FULL.pdf
Restricted to Hanya staf

Download (1651Kb) | Minta salinan
[img]
Preview
File PDF
SKRIPSI TANPA BAB PEMBAHASAN.pdf

Download (1081Kb) | Preview

Abstrak (Berisi Bastraknya saja, Judul dan Nama Tidak Boleh di Masukan)

Tujuan penelitian ini untuk mengetahui penerapan rendal har (perencanaan dan pengendalian pemeliharaan) di unit logistik PT. PLN (Persero) UPDK Bandar Lampung. Penelitian ini menggunakan metode kualitatif yaitu melalui wawancara, pengamatan serta dokumentasi. Hasil penelitian ini menerangkan bahwa penerapan rendal har (perencanaan dan pengendalian pemeliharaan) di PT. PLN (Persero) UPDK Bandar Lampung meliputi beberapa kegiatan, seperti perencanaan (rencana lima tahunan, rencanan tahunan, rencana tiga bulanan, rencana mingguan, dan rencana mingguan), perorganisasian antara beberapa bagian (rendal har, rendal op, dan staff logistik), dan pelaksanaan (service request, work order, job card, dan backlog). Kata Kunci : Perencanaan, Pengendalian, Pemeliharaan The purpose of this study was to determine the implementation of low har (maintenance planning and control) in the logistics unit of PT. PLN (Persero) UPDK Bandar Lampung. This study uses qualitative methods, namely through interviews, observation and documentation. The results of this study explain that the implementation of low har (maintenance planning and control) at PT. PLN (Persero) UPDK Bandar Lampung includes several activities, such as planning (five-year plan, annual plan, quarterly plan, weekly plan, and weekly plan), organization between several sections (rendal har, rendal op, and logistics staff), and implementation (service requests, work orders, job cards, and backlog). Keywords: Planning, Control, Maintenance

Jenis Karya Akhir: Diploma/Tugas Akhir
Subyek: 000 Ilmu komputer, informasi dan pekerjaan umum > 001 Ilmu pengetahuan
300 Ilmu sosial
300 Ilmu sosial > 350 Administrasi publik dan ilmu militer
Program Studi: Fakultas ISIP > Prodi D3 Sekretari
Pengguna Deposit: 2308576404 . Digilib
Date Deposited: 05 Oct 2023 08:31
Terakhir diubah: 05 Oct 2023 08:31
URI: http://digilib.unila.ac.id/id/eprint/76127

Actions (login required)

Lihat Karya Akhir Lihat Karya Akhir